STUDBOLT,1INX110MM,B7/2H

Material 4100024661 · STUDBOLT · Plant 1000

ASafety-criticalReorderNormalBelow reorder point
Material
4100024661
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (8 of 11 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
SURYA PERKASA GLOBAL PT
Lead time
28 d · P80 41 d
Unit price
Rp 57,141

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 44 EA/year: 44 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~28 days; expected demand during lead time 3.4.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 27, order up to 71.
  • 5.On hand 6 + on order 0 is at or below the reorder point: order 65 now.
  • 6.Installed on 11 FuncLoc(s), 8 of them criticality A/B.
  • 7.ML early warning: 70% probability of demand in the next 90 days.
Proposed purchase requisition
65 EA
Rp 3.7M · order by 01 Oct 2026
Expected arrival ≈ 28 days
Safety-critical (SCE)ML early warningSingle source
On hand / on order
6 / 0
no open PO
Today Min / Max
3 / 4
static parameters in BoM
Rec. Min (reorder point)
27
safety stock 24
Rec. Max
71
order qty 44
Service level
99.9%
stockout risk now 32%
Unit price
Rp 57,141
PO history
ML early warning: 70% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 1 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 11 functional locations

8 with criticality A/B · 192 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-884B
RECYCLE ETHANE TLE
A2421.08
PX_VD-786
BOTTOM KO DRUM
A2020.93
PX_HE-1455C
COOLING WATER COOLER
A810.22
PX_LCV-173
LEVEL CONTROL VALVE
A1200.12
PX_PP-745
FEED PUMP
B2472.76
PX_PP-1637A
DILUTION STEAM PUMP
B2420.62
PX_HE-1428C
RECYCLE ETHANE COOLER
B2010.65
PX_LCV-1691
LEVEL CONTROL VALVE
B800.12
PX_PCV-330
HE-213B PRESSURE CONTROL
C2431.36
PX_PRV-1147
SAFETY VALVE HE-1774A
C1600.04
PX_KT-447
TURBINE FOR KC-447
S12136.24

Lead time and procurement

Lead time 28 ± 13 days (PO history, 3 PO lines) · on-time 49%

PR dateTypeQtyUnit priceDeliveryLead time
05 Jul 2026PR03
Regular replenishment
10Rp 55,15325 Jul 202620 d
24 Feb 2026PR03
Regular replenishment
16Rp 59,12406 Apr 202641 d
26 Jul 2025PR03
Regular replenishment
17Rp 57,14104 Sept 202540 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
08 Aug 2026MediumPX_PP-745PP-745 high vibration
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding
08 Jun 2026EmergencyPX_PP-745[MSI-B-26-YAH-100/M] Replace line
13 May 2026LowPX_KT-447KT-447 trip test
13 May 2026LowPX_PP-745Leak from packing
19 Apr 2026LowPX_KT-447Follow up after steam upset KT-447
30 Mar 2026LowPX_KT-447Leak from packing
28 Mar 2026MediumPX_KT-447Follow up after steam upset KT-447
14 Mar 2026MediumPX_KT-447KT-447 steam leak at gland

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20268201000019647Corrective
19 Sept 202612201000017105Corrective
15 Nov 20258202000000101Emergency
14 Nov 20258201000020069Corrective
14 Oct 20258204000024319Preventive