STUDBOLT,7/8INX110MM,B7/2H

Material 4100024686 · STUDBOLT · Plant 1000

AReorderCriticalStockout
Material
4100024686
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (8 of 14 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
20 d · P80 25 d
Unit price
Rp 99,368

Recommendation

  • 1.Forecast 209 EA/year: 209 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~20 days; expected demand during lead time 11.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 84, order up to 262.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 262 now.
  • 5.Installed on 14 FuncLoc(s), 8 of them criticality A/B.
  • 6.ML early warning: 84% probability of demand in the next 90 days.
Proposed purchase requisition
262 EA
Rp 26.0M · order by 01 Oct 2026
Expected arrival ≈ 20 days
ML early warningLast turnaround used 48Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
39 / 69
static parameters in BoM
Rec. Min (reorder point)
84
safety stock 73
Rec. Max
262
order qty 178
Service level
100.0%
stockout risk now 42%
Unit price
Rp 99,368
PO history
ML early warning: 84% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 68 days ago, 26 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (48 units) excluded from the baseline.

Demand pattern Lumpy · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 14 functional locations

8 with criticality A/B · 188 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A411442.86
PX_KT-460B
TURBINE FOR KC-460B
A1221.96
PX_4-LS-7492-A21A-H
PIPE-4 FROM PP-423A TO PP-254A
A1600.01
PX_PP-601
DEMIN WATER PUMP
B2072.33
PX_PP-473A
CONDENSATE PUMP
B1261.47
PX_LCV-1352A
LEVEL CONTROL VALVE
B2420.55
PX_CL-1224
QUENCH OIL STRIPPER
B410.38
PX_PP-256
RICH AMINE PUMP
B400.19
PX_PCV-1859
BY PASS DUCT
C2441.36
PX_1-CW-26624-B23A-T
PIPE-1 FROM HE-553 TO CL-164
C1200.01
PX_LCV-1837
CL-448 LEVEL CONTROL
C2000.12
PX_PCV-786
BY PASS DUCT
C2400.08

Lead time and procurement

Lead time 20 ± 10 days (PO history, 7 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
20 Aug 2026PR03
Regular replenishment
30Rp 95,82503 Sept 202614 d
16 Jul 2026PR03
Regular replenishment
92Rp 94,79806 Aug 202621 d
25 Dec 2025PR03
Regular replenishment
47Rp 100,69401 Jan 20267 d
03 Aug 2025PR03
Regular replenishment
26Rp 99,36816 Aug 202513 d
27 Jul 2025PR03
Regular replenishment
57Rp 100,39022 Aug 202526 d
06 Jun 2025PR03
Regular replenishment
85Rp 101,84125 Jun 202519 d
24 May 2025PR06
Regular replenishment
60Rp 99,27220 Jun 202527 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
14 Sept 2026LowPX_BF-105Install cover plate BF-105
13 Sept 2026MediumPX_BF-105Thermograph wall BF-105
12 Sept 2026MediumPX_PP-473APainting PP-473A
06 Sept 2026MediumPX_BF-105Repair insulation BF-105
01 Sept 2026LowPX_BF-105Peep door broken BF-105
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
30 Aug 2026MediumPX_BF-105Painting BF-105

Recent goods issues

Posting dateQtyOrderOrder type
25 Jul 20268201000014397Corrective
02 May 20268201000025318Corrective
01 May 202616201000025318Corrective
31 Dec 202532201000039565Corrective
31 Dec 202524201000039565Corrective
19 Dec 202548203000033370Turnaround
15 Dec 202516201000018573Corrective