STUDBOLT,7/8INX90MM,B8M/8M

Material 4100024721 · STUDBOLT · Plant 1000

ASafety-criticalReorderCriticalBelow reorder point
Material
4100024721
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 9 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 84 EA/year: 84 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~23 days; expected demand during lead time 5.3.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 68, order up to 152.
  • 5.On hand 4 + on order 0 is at or below the reorder point: order 148 now.
  • 6.Installed on 9 FuncLoc(s), 4 of them criticality A/B.
  • 7.ML early warning: 35% probability of demand in the next 90 days.
Proposed purchase requisition
148 EA
Rp 5.6M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)ML early warningPrice estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
3 / 7
static parameters in BoM
Rec. Min (reorder point)
68
safety stock 63
Rec. Max
152
order qty 84
Service level
100.0%
stockout risk now 21%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 35% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 102 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 802.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 9 functional locations

4 with criticality A/B · 144 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-397A
TURBINE FOR KC-397A
A2452.81
PX_KC-106B
GASOLINE BLOWER
A2021.00
PY_VD-1070A
SLOP OIL DRUM
A820.51
PX_KC-621
SEAL OIL FAN
A1600.57
PX_LCV-639B
HE-1437C LEVEL CONTROL
C1620.55
PX_KC-582B
CAUSTIC BLOWER
S8103.57
PX_CL-899
SLOP OIL COLUMN
S800.38
PX_FCV-1667
LEAN AMINE FLOW CONTROL
S2000.11
PX_PRV-1576A
SAFETY VALVE PP-376A
S2400.04

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Sept 2026HighPX_KC-582BKC-582B high vibration
26 Aug 2026LowPX_KC-582BPainting KC-582B
08 Jul 2026LowPX_KC-582BInstall scaffolding at KC-582B
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding
14 May 2026LowPX_KT-397AKT-397A trip test
09 May 2026LowPY_VD-1070AVD-1070A level glass broken
28 Apr 2026HighPX_KC-582BKC-582B lube oil filter DP high
20 Apr 2026EmergencyPX_KC-582BRepair insulation KC-582B
02 Apr 2026MediumPX_KT-397AFollow up after steam upset KT-397A

Recent goods issues

Posting dateQtyOrderOrder type
21 Jun 20268204000024639Preventive
31 Mar 202648201000001342Corrective
25 Jan 202632201000030438Corrective
24 Dec 20258201000034786Corrective
08 Dec 202516201000039078Corrective