STUDBOLT,3/4INX55MM,B8M/8M
Material 4100024754 · STUDBOLT · Plant 1000
ASafety-criticalMonitorTAM reserve
- Material
- 4100024754
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 7 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 5.5 EA/year: 5.5 unplanned (installed-base failure prior (no history)).
- 3.Lead time ~23 days; expected demand during lead time 0.3.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 27, order up to 54.
- 5.Used only during the last turnaround (72 EA): keep it for the next one instead of treating it as slow-moving.
- 6.Installed on 7 FuncLoc(s), 2 of them criticality A/B.
Safety-critical (SCE)Last turnaround used 72Price estimatedLead time estimated
On hand / on order
31 / 0
no open PO
Today Min / Max
25 / 68
static parameters in BoM
Rec. Min (reorder point)
27
safety stock 27
Rec. Max
54
order qty 27
Service level
100.0%
stockout risk now 0%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (72 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 44.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 7 functional locations
2 with criticality A/B · 116 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-621 PP-902B OUTLET FLOW | A | 24 | 4 | 1.39 |
| PX_PRV-426A SAFETY VALVE KC-452 | B | 24 | 0 | 0.04 |
| PX_3/4-IA-15384-A41A PIPE-3/4 FROM PP-1279 TO KC-235D | C | 20 | 0 | 0.01 |
| PX_FCV-825 GASOLINE FLOW CONTROL | C | 4 | 0 | 0.11 |
| PY_PCV-1975 PRESSURE CONTROL VALVE | C | 8 | 0 | 0.08 |
| PX_KT-202 TURBINE FOR KC-202 | S | 20 | 4 | 2.81 |
| PX_KC-511C FUEL OIL FAN | S | 16 | 1 | 0.57 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 28 Jun 2026 | Medium | PX_FCV-621 | Install scaffolding at FCV-621 |
| 22 Jan 2026 | Medium | PX_FCV-621 | Leak from packing |
| 09 Jan 2026 | Medium | PX_KT-202 | KT-202 governor valve hunting |
| 24 Sept 2025 | Low | PX_FCV-621 | Replace lamp as per PM finding |
| 17 Sept 2025 | Medium | PX_KT-202 | Replace lamp as per PM finding |
| 24 Jul 2025 | Medium | PX_KC-511C | Install scaffolding at KC-511C |
| 18 Jul 2025 | High | PX_FCV-621 | FCV-621 stuck |
| 06 Jul 2025 | Low | PX_KT-202 | KT-202 steam leak at gland |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 Jan 2026 | 72 | 203000006950 | Turnaround |