STUDBOLT,7/8INX40MM,B8M/8M

Material 4100024792 · STUDBOLT · Plant 1000

BSafety-criticalReorderNormalSlow-moving
Material
4100024792
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
B (2 of 4 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 77 EA/year: 77 unplanned (recency-weighted compound poisson (own history)).
  • 3.Lead time ~23 days; expected demand during lead time 4.8.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 66, order up to 143.
  • 5.On hand 30 + on order 0 is at or below the reorder point: order 113 now.
  • 6.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
113 EA
Rp 4.3M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)Last turnaround used 72Price estimatedLead time estimated
On hand / on order
30 / 0
no open PO
Today Min / Max
19 / 41
static parameters in BoM
Rec. Min (reorder point)
66
safety stock 62
Rec. Max
143
order qty 77
Service level
100.0%
stockout risk now 14%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 276 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (72 units) excluded from the baseline.

Demand pattern Lumpy · 6 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 504.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 4 functional locations

2 with criticality A/B · 60 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_VD-1417C
FLUSHING OIL ACCUMULATOR
B2410.08
PX_PRV-1382
SAFETY VALVE PP-1164B
B2000.04
PX_1-QO-7942-A11A-HS
PIPE-1 FROM VD-1447 TO PP-682A
C1200.01
PX_KT-202
TURBINE FOR KC-202
S442.81

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
09 Jan 2026MediumPX_KT-202KT-202 governor valve hunting
17 Sept 2025MediumPX_KT-202Replace lamp as per PM finding
06 Jul 2025LowPX_KT-202KT-202 steam leak at gland
10 May 2025MediumPX_VD-1417CReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
29 Dec 202596201000039789Corrective
20 Dec 202572203000033370Turnaround
13 Dec 20254201000000971Corrective
17 Nov 20258201000002039Corrective
11 Nov 202548201000025137Corrective
31 Aug 20254201000034164Corrective
31 Jul 202536209000031000Other maintenance