STUDBOLT,7/8INX40MM,B8M/8M
Material 4100024792 · STUDBOLT · Plant 1000
BSafety-criticalReorderNormalSlow-moving
- Material
- 4100024792
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (2 of 4 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 77 EA/year: 77 unplanned (recency-weighted compound poisson (own history)).
- 3.Lead time ~23 days; expected demand during lead time 4.8.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 66, order up to 143.
- 5.On hand 30 + on order 0 is at or below the reorder point: order 113 now.
- 6.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
113 EA
Rp 4.3M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)Last turnaround used 72Price estimatedLead time estimated
On hand / on order
30 / 0
no open PO
Today Min / Max
19 / 41
static parameters in BoM
Rec. Min (reorder point)
66
safety stock 62
Rec. Max
143
order qty 77
Service level
100.0%
stockout risk now 14%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 276 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (72 units) excluded from the baseline.
Demand pattern Lumpy · 6 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 504.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 4 functional locations
2 with criticality A/B · 60 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_VD-1417C FLUSHING OIL ACCUMULATOR | B | 24 | 1 | 0.08 |
| PX_PRV-1382 SAFETY VALVE PP-1164B | B | 20 | 0 | 0.04 |
| PX_1-QO-7942-A11A-HS PIPE-1 FROM VD-1447 TO PP-682A | C | 12 | 0 | 0.01 |
| PX_KT-202 TURBINE FOR KC-202 | S | 4 | 4 | 2.81 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 09 Jan 2026 | Medium | PX_KT-202 | KT-202 governor valve hunting |
| 17 Sept 2025 | Medium | PX_KT-202 | Replace lamp as per PM finding |
| 06 Jul 2025 | Low | PX_KT-202 | KT-202 steam leak at gland |
| 10 May 2025 | Medium | PX_VD-1417C | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 29 Dec 2025 | 96 | 201000039789 | Corrective |
| 20 Dec 2025 | 72 | 203000033370 | Turnaround |
| 13 Dec 2025 | 4 | 201000000971 | Corrective |
| 17 Nov 2025 | 8 | 201000002039 | Corrective |
| 11 Nov 2025 | 48 | 201000025137 | Corrective |
| 31 Aug 2025 | 4 | 201000034164 | Corrective |
| 31 Jul 2025 | 36 | 209000031000 | Other maintenance |