STUDBOLT,7/8INX100MM,B16/4
Material 4100024822 · STUDBOLT · Plant 1000
ASafety-criticalReorderNormalBelow reorder point
- Material
- 4100024822
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (10 of 19 FuncLocs A/B, 2 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 245 EA/year: 242 unplanned (recency-weighted compound poisson (own history)) + 2.9 from the maintenance plan.
- 3.Lead time ~23 days; expected demand during lead time 15.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 119, order up to 365.
- 5.On hand 78 + on order 0 is at or below the reorder point: order 287 now.
- 6.Installed on 19 FuncLoc(s), 10 of them criticality A/B.
- 7.ML early warning: 56% probability of demand in the next 90 days.
Proposed purchase requisition
287 EA
Rp 10.9M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)ML early warningAbnormal consumptionPrice estimatedLead time estimated
On hand / on order
78 / 0
no open PO
Today Min / Max
14 / 32
static parameters in BoM
Rec. Min (reorder point)
119
safety stock 104
Rec. Max
365
order qty 246
Service level
100.0%
stockout risk now 2%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 56% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 95 days ago, 32 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 8 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 19 functional locations
10 with criticality A/B · 236 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-102 CRACKING FURNACE BF-102 | A | 4 | 71 | 28.72 |
| PX_KT-460B TURBINE FOR KC-460B | A | 4 | 2 | 1.96 |
| PX_HE-1776 HYDROGEN TLE | A | 4 | 0 | 0.22 |
| PX_KC-426D RICH AMINE BLOWER | A | 8 | 0 | 0.57 |
| PY_VD-383 QUENCH OIL SURGE DRUM | A | 16 | 0 | 0.08 |
| PX_HE-1372D INHIBITOR COOLER | B | 16 | 3 | 1.08 |
| PX_HE-903B FEED PREHEATER | B | 20 | 2 | 0.65 |
| PX_HE-406A HYDROGEN PREHEATER | B | 24 | 1 | 0.22 |
| PX_PP-128C COOLING WATER PUMP | B | 8 | 0 | 0.19 |
| PX_VD-996 FLUSHING OIL SEPARATOR | B | 24 | 0 | 0.08 |
| PX_LCV-365 VD-793A LEVEL CONTROL | C | 12 | 2 | 0.55 |
| PX_3/4-BF-4000-B21A-C PIPE-3/4 FROM CL-1744 TO PP-885 | C | 4 | 0 | 0.01 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 02 Jun 2027 | PX_PP-1007A | Pump overhaul | 2.86 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 21 Sept 2026 | Medium | PX_BF-110 | Replace burner tip BF-110 |
| 19 Sept 2026 | High | PX_KT-383A | [MSI-B-26-CWK-358] Permanent repair |
| 17 Sept 2026 | Medium | PX_BF-110 | Install scaffolding at BF-110 |
| 16 Sept 2026 | Medium | PX_KT-383A | Install scaffolding at KT-383A |
| 15 Sept 2026 | Medium | PX_BF-110 | Decoking follow up BF-110 |
| 11 Sept 2026 | Medium | PX_BF-110 | Leak from packing |
| 07 Sept 2026 | Low | PX_BF-102 | Thermograph wall BF-102 |
| 06 Sept 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
| 03 Sept 2026 | Medium | PX_BF-102 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Jun 2026 | 96 | 201000019754 | Corrective |
| 20 Jan 2026 | 12 | 201000013220 | Corrective |
| 19 Jan 2026 | 8 | 201000013220 | Corrective |
| 15 Jan 2026 | 8 | 201000010079 | Corrective |
| 11 Nov 2025 | 32 | 201000024069 | Corrective |
| 18 Oct 2025 | 24 | 201000027023 | Corrective |
| 21 Aug 2025 | 36 | 209000024789 | Other maintenance |
| 12 Aug 2025 | 12 | 201000012190 | Corrective |
| 12 Aug 2025 | 16 | 201000012190 | Corrective |