STUDBOLT,1/2INX65MM,B7/2H

Material 4100024848 · STUDBOLT · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100024848
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 8 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
17 d · P80 17 d
Unit price
Rp 18,334

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 180 EA/year: 180 unplanned (recency-weighted compound poisson (own history)).
  • 3.Lead time ~17 days; expected demand during lead time 8.5.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 108, order up to 289.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 289 now.
  • 6.Installed on 8 FuncLoc(s), 5 of them criticality A/B.
  • 7.ML early warning: 83% probability of demand in the next 90 days.
Proposed purchase requisition
289 EA
Rp 5.3M · order by 01 Oct 2026
Expected arrival ≈ 17 days
Safety-critical (SCE)ML early warningSingle sourceAbnormal consumption
On hand / on order
0 / 0
no open PO
Today Min / Max
49 / 143
static parameters in BoM
Rec. Min (reorder point)
108
safety stock 100
Rec. Max
289
order qty 181
Service level
100.0%
stockout risk now 21%
Unit price
Rp 18,334
PO history
ML early warning: 83% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 7 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 8 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 8 functional locations

5 with criticality A/B · 100 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-274C
QUENCH OIL REBOILER
A2410.22
PX_VD-123A
C3 RECYCLE SEPARATOR
A810.08
PX_PRV-525
SAFETY VALVE PP-481A
A400.04
PY_CL-890
CONDENSATE SCRUBBER
B1231.23
PX_HE-126A
CHARGE GAS PREHEATER
B2000.22
PX_FCV-832A
CONTROL VALVE
C1200.11
PX_VD-1012
CHARGE GAS ACCUMULATOR
C1600.08
PX_PRV-193
SAFETY VALVE HE-1468A
S400.04

Lead time and procurement

Lead time 17 ± 6 days (PO history, 6 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
16 Jul 2026PR06
Regular replenishment
72Rp 19,10129 Jul 202613 d
20 Jun 2026PR06
Regular replenishment
130Rp 19,11907 Jul 202617 d
30 Apr 2026PR03
Regular replenishment
62Rp 17,78212 May 202612 d
04 Apr 2026PR03
Regular replenishment
70Rp 17,96717 Apr 202613 d
05 Dec 2025PR06
Regular replenishment
51Rp 18,70122 Dec 202517 d
05 May 2025PR03
Regular replenishment
57Rp 17,85519 May 202514 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jun 2026LowPY_CL-890Leak from packing
31 Jan 2026MediumPY_CL-890Leak from packing
31 May 2025LowPY_CL-890Inspect CL-890 internal
16 May 2025MediumPX_VD-123APSM25/Repair insulation VD-123A
06 May 2025MediumPX_HE-274CInstall scaffolding at HE-274C

Recent goods issues

Posting dateQtyOrderOrder type
24 Sept 202672209000029477Other maintenance
27 Aug 202696201000020092Corrective
29 Apr 20268201000011072Corrective
17 Jan 202648201000016958Corrective
28 Oct 202512201000012002Corrective
27 Oct 202532201000012002Corrective
22 Sept 20258201000009723Corrective
10 Jul 202512209000024650Other maintenance