Sparely
DU

STUDBOLT,7/8INX90MM,B16/4

Material 4100024849 · STUDBOLT · Plant 1000

AReorderCriticalStockout
Material
4100024849
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (7 of 9 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Forecast 86 EA/year: 86 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~23 days; expected demand during lead time 5.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 71, order up to 158.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 158 now.
  • 5.Installed on 9 FuncLoc(s), 7 of them criticality A/B.
  • 6.ML early warning: 37% probability of demand in the next 90 days.
Proposed purchase requisition
158 EA
Rp 6.0M · order by 01 Oct 2026
Expected arrival ≈ 23 days
ML early warningLast turnaround used 24Abnormal consumptionPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
4 / 8
static parameters in BoM
Rec. Min (reorder point)
71
safety stock 66
Rec. Max
158
order qty 87
Service level
99.9%
stockout risk now 14%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 260 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (60 units) excluded from the baseline.

Demand pattern Lumpy · 4 issue days · 1 abnormal issue(s) capped · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 523.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 9 functional locations

7 with criticality A/B · 148 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-966
C4 PRODUCT PREHEATER
A800.22
PX_KT-308B
TURBINE FOR KC-308B
A2001.10
PX_TCV-1626
VD-272 TEMP CONTROL
A1200.12
PX_KC-624A
RECYCLE ETHANE BLOWER
B452.28
PX_HE-1565B
REFLUX COOLER
B2431.08
PX_HE-779D
FEED PREHEATER
B2410.22
PY_LCV-1056
LEVEL CONTROL VALVE
B2400.12
PX_FCV-611A
INHIBITOR FLOW CONTROL
C1230.54
PX_KT-383A
TURBINE FOR KC-383A
S2073.67

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
21 Aug 2026MediumPX_KC-624AKC-624A high vibration
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
10 Aug 2026MediumPX_KC-624ALeak from packing
18 Jun 2026LowPX_KC-624AOverhaul
24 May 2026HighPX_KT-383AKT-383A steam leak at gland
15 Apr 2026LowPX_FCV-611APainting FCV-611A

Recent goods issues

Posting dateQtyOrderOrder type
14 Jan 202632201000011325Corrective
28 Dec 202524203000006078Turnaround
02 Oct 202516201000007266Corrective
19 Aug 202536203000007731Turnaround
11 Aug 202596201000003400Corrective
06 Aug 202524209000000237Other maintenance