STUDBOLT,7/8INX90MM,B16/4
Material 4100024849 · STUDBOLT · Plant 1000
AReorderCriticalStockout
- Material
- 4100024849
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (7 of 9 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 86 EA/year: 86 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~23 days; expected demand during lead time 5.4.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 71, order up to 158.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 158 now.
- 5.Installed on 9 FuncLoc(s), 7 of them criticality A/B.
- 6.ML early warning: 37% probability of demand in the next 90 days.
Proposed purchase requisition
158 EA
Rp 6.0M · order by 01 Oct 2026
Expected arrival ≈ 23 days
ML early warningLast turnaround used 24Abnormal consumptionPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
4 / 8
static parameters in BoM
Rec. Min (reorder point)
71
safety stock 66
Rec. Max
158
order qty 87
Service level
99.9%
stockout risk now 14%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 260 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (60 units) excluded from the baseline.
Demand pattern Lumpy · 4 issue days · 1 abnormal issue(s) capped · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 523.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 9 functional locations
7 with criticality A/B · 148 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-966 C4 PRODUCT PREHEATER | A | 8 | 0 | 0.22 |
| PX_KT-308B TURBINE FOR KC-308B | A | 20 | 0 | 1.10 |
| PX_TCV-1626 VD-272 TEMP CONTROL | A | 12 | 0 | 0.12 |
| PX_KC-624A RECYCLE ETHANE BLOWER | B | 4 | 5 | 2.28 |
| PX_HE-1565B REFLUX COOLER | B | 24 | 3 | 1.08 |
| PX_HE-779D FEED PREHEATER | B | 24 | 1 | 0.22 |
| PY_LCV-1056 LEVEL CONTROL VALVE | B | 24 | 0 | 0.12 |
| PX_FCV-611A INHIBITOR FLOW CONTROL | C | 12 | 3 | 0.54 |
| PX_KT-383A TURBINE FOR KC-383A | S | 20 | 7 | 3.67 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Sept 2026 | High | PX_KT-383A | [MSI-B-26-CWK-358] Permanent repair |
| 16 Sept 2026 | Medium | PX_KT-383A | Install scaffolding at KT-383A |
| 02 Sept 2026 | Low | PX_KT-383A | Replace lamp as per PM finding |
| 23 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 21 Aug 2026 | Medium | PX_KC-624A | KC-624A high vibration |
| 19 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 10 Aug 2026 | Medium | PX_KC-624A | Leak from packing |
| 18 Jun 2026 | Low | PX_KC-624A | Overhaul |
| 24 May 2026 | High | PX_KT-383A | KT-383A steam leak at gland |
| 15 Apr 2026 | Low | PX_FCV-611A | Painting FCV-611A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Jan 2026 | 32 | 201000011325 | Corrective |
| 28 Dec 2025 | 24 | 203000006078 | Turnaround |
| 02 Oct 2025 | 16 | 201000007266 | Corrective |
| 19 Aug 2025 | 36 | 203000007731 | Turnaround |
| 11 Aug 2025 | 96 | 201000003400 | Corrective |
| 06 Aug 2025 | 24 | 209000000237 | Other maintenance |