Sparely
DU

STUDBOLT,3/4INX95MM,B8M/8M

Material 4100024869 · STUDBOLT · Plant 1000

ASafety-criticalReduceExcess
Material
4100024869
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 5 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
25 d · P80 38 d
Unit price
Rp 15,455

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 115 EA/year: 103 unplanned (credibility blend: own history + installed-base prior) + 11 from the maintenance plan.
  • 3.Lead time ~25 days; expected demand during lead time 7.1.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 100, order up to 215.
  • 5.Stock 444 exceeds the level to keep (215) by 229.
  • 6.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Safety-critical (SCE)Last turnaround used 36Single source
On hand / on order
444 / 0
no open PO
Today Min / Max
95 / 215
static parameters in BoM
Rec. Min (reorder point)
100
safety stock 93
Rec. Max
215
order qty 115
Service level
100.0%
stockout risk now 0%
Unit price
Rp 15,455
PO history
ML early warning: 26% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 79 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (324 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 444.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 5 functional locations

2 with criticality A/B · 60 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-308B
TURBINE FOR KC-308B
A1201.10
PX_PRV-624
SAFETY VALVE HE-232C
B420.90
PX_LCV-775
HE-561A LEVEL CONTROL
C1600.12
PX_VD-436
DILUTION STEAM SURGE DRUM
C2000.08
PY_PRV-1528
SAFETY VALVE CL-1326
S800.04

Lead time and procurement

Lead time 25 ± 17 days (PO history, 5 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
23 Apr 2026PR06
Regular replenishment
112Rp 16,11802 May 20269 d
03 Feb 2026PR06
Regular replenishment
83Rp 15,00909 Mar 202634 d
29 Jan 2026PR03
Regular replenishment
233Rp 15,09015 Feb 202617 d
10 Dec 2025PR03
Regular replenishment
125Rp 15,62327 Dec 202517 d
12 Sept 2025PR04
Regular (other)
213Rp 15,45507 Nov 202556 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Sept 2027PX_LCV-775Final Element Overhaul; Control Valve11.5

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 Apr 2026EmergencyPX_PRV-624Replace lamp as per PM finding
07 Jul 2025MediumPX_PRV-624PRV-624 passing

Recent goods issues

Posting dateQtyOrderOrder type
14 Jul 202648201000034553Corrective
17 Dec 20258201000011845Corrective
29 Nov 202512203000032713Turnaround
17 Nov 202596201000002039Corrective
09 Nov 202524203000039046Turnaround
05 Oct 202548201000016100Corrective
16 Aug 2025288203000007731Turnaround