Sparely
DU

STUDBOLT,5/8INX45MM,B7/2H

Material 4100024915 · STUDBOLT · Plant 1000

AReorderNormalSlow-moving
Material
4100024915
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 5 FuncLocs A/B)
Supplier
GUNUNG SARANA SENTOSA PT
Lead time
19 d · P80 39 d
Unit price
Rp 30,174

Recommendation

  • 1.Forecast 40 EA/year: 37 unplanned (credibility blend: own history + installed-base prior) + 2.9 from the maintenance plan.
  • 2.Lead time ~19 days; expected demand during lead time 1.9.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 64, order up to 104.
  • 4.On hand 55 + on order 0 is at or below the reorder point: order 49 now.
  • 5.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
49 EA
Rp 1.5M · order by 01 Oct 2026
Expected arrival ≈ 19 days
Single source
On hand / on order
55 / 0
no open PO
Today Min / Max
17 / 26
static parameters in BoM
Rec. Min (reorder point)
64
safety stock 63
Rec. Max
104
order qty 40
Service level
100.0%
stockout risk now 0%
Unit price
Rp 30,174
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 255 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 245.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 5 functional locations

5 with criticality A/B · 60 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-801
DEMIN WATER FAN
A2021.43
PX_PCV-527B
PRESSURE CONTROL VALVE
A1210.08
PX_PP-508D
FEED PUMP
A400.19
PX_CL-348
SEAL OIL TOWER
B2030.81
PX_10-HS-19165-B23A
PIPE-10 FROM PP-606D TO HE-112
B400.01

Lead time and procurement

Lead time 19 ± 15 days (PO history + category, 2 PO lines) · on-time 45%

PR dateTypeQtyUnit priceDeliveryLead time
11 Jan 2026PR03
Regular replenishment
25Rp 29,85521 Jan 202610 d
31 Jul 2025PR04
Regular (other)
16Rp 30,49218 Aug 202518 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Jan 2027PX_PP-508DPump overhaul2.86

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 Sept 2026LowPX_CL-348Leak from packing
12 Apr 2026EmergencyPX_KC-801KC-801 high vibration
15 Mar 2026LowPX_CL-348Install scaffolding at CL-348
12 Jul 2025LowPX_KC-801KC-801 bearing temp high
22 May 2025MediumPX_CL-348PSM25/[MSI-B-25-GCX-389] Permanent repai
05 May 2025MediumPX_PCV-527BPCV-527B stuck

Recent goods issues

Posting dateQtyOrderOrder type
19 Jan 202648201000000915Corrective
15 Jan 202616201000026129Corrective