STUDBOLT,5/8INX45MM,B7/2H
Material 4100024915 · STUDBOLT · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100024915
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (5 of 5 FuncLocs A/B)
- Supplier
- GUNUNG SARANA SENTOSA PT
- Lead time
- 19 d · P80 39 d
- Unit price
- Rp 30,174
Recommendation
- 1.Forecast 40 EA/year: 37 unplanned (credibility blend: own history + installed-base prior) + 2.9 from the maintenance plan.
- 2.Lead time ~19 days; expected demand during lead time 1.9.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 64, order up to 104.
- 4.On hand 55 + on order 0 is at or below the reorder point: order 49 now.
- 5.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
49 EA
Rp 1.5M · order by 01 Oct 2026
Expected arrival ≈ 19 days
Single source
On hand / on order
55 / 0
no open PO
Today Min / Max
17 / 26
static parameters in BoM
Rec. Min (reorder point)
64
safety stock 63
Rec. Max
104
order qty 40
Service level
100.0%
stockout risk now 0%
Unit price
Rp 30,174
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 255 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 245.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 5 functional locations
5 with criticality A/B · 60 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-801 DEMIN WATER FAN | A | 20 | 2 | 1.43 |
| PX_PCV-527B PRESSURE CONTROL VALVE | A | 12 | 1 | 0.08 |
| PX_PP-508D FEED PUMP | A | 4 | 0 | 0.19 |
| PX_CL-348 SEAL OIL TOWER | B | 20 | 3 | 0.81 |
| PX_10-HS-19165-B23A PIPE-10 FROM PP-606D TO HE-112 | B | 4 | 0 | 0.01 |
Lead time and procurement
Lead time 19 ± 15 days (PO history + category, 2 PO lines) · on-time 45%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 11 Jan 2026 | PR03 Regular replenishment | 25 | Rp 29,855 | 21 Jan 2026 | 10 d |
| 31 Jul 2025 | PR04 Regular (other) | 16 | Rp 30,492 | 18 Aug 2025 | 18 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Jan 2027 | PX_PP-508D | Pump overhaul | 2.86 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 Sept 2026 | Low | PX_CL-348 | Leak from packing |
| 12 Apr 2026 | Emergency | PX_KC-801 | KC-801 high vibration |
| 15 Mar 2026 | Low | PX_CL-348 | Install scaffolding at CL-348 |
| 12 Jul 2025 | Low | PX_KC-801 | KC-801 bearing temp high |
| 22 May 2025 | Medium | PX_CL-348 | PSM25/[MSI-B-25-GCX-389] Permanent repai |
| 05 May 2025 | Medium | PX_PCV-527B | PCV-527B stuck |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Jan 2026 | 48 | 201000000915 | Corrective |
| 15 Jan 2026 | 16 | 201000026129 | Corrective |