STUDBOLT,3/4INX35MM,B8M/8M

Material 4100024958 · STUDBOLT · Plant 1000

ASafety-criticalReorderNormalCritical insurance spare
Material
4100024958
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 5 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 3.4 EA/year: 3.4 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~23 days; expected demand during lead time 0.2.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 27, order up to 54.
  • 5.On hand 1 + on order 0 is at or below the reorder point: order 53 now.
  • 6.No issue in 17 months, but it protects critical equipment: keep it.
  • 7.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
53 EA
Rp 2.0M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
27
safety stock 27
Rec. Max
54
order qty 27
Service level
100.0%
stockout risk now 1%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 27.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 5 functional locations

3 with criticality A/B · 76 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A872.81
PX_PCV-1627
PRESSURE CONTROL VALVE
A1600.08
PX_PP-1969B
FEED PUMP
B800.19
PX_1-1/2-LS-6362-A21A
PIPE-1-1/2 FROM VD-1513 TO PP-455D
C2400.01
PX_PRV-1147
SAFETY VALVE HE-1774A
C2000.04

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
20 Nov 2025MediumPX_KT-856AKT-856A governor valve hunting
16 Nov 2025LowPX_KT-856AInstall scaffolding at KT-856A
04 Sept 2025LowPX_KT-856AInstall scaffolding at KT-856A
26 Aug 2025LowPX_KT-856AReplace lamp as per PM finding
09 May 2025MediumPX_KT-856APSM25/KT-856A steam leak at gland

Recent goods issues

Never issued in the 17-month history.