STUDBOLT,5/8INX50MM,B16/4

Material 4100024968 · STUDBOLT · Plant 1000

AReorderNormalBelow reorder point
Material
4100024968
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 8 FuncLocs A/B)
Supplier
GEMILANG LOGAM MAKMUR PT
Lead time
26 d · P80 39 d
Unit price
Rp 16,999

Recommendation

  • 1.Forecast 23 EA/year: 23 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~26 days; expected demand during lead time 1.6.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 24, order up to 47.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 45 now.
  • 5.Installed on 8 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
45 EA
Rp 764,955 · order by 01 Oct 2026
Expected arrival ≈ 26 days
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
24
safety stock 23
Rec. Max
47
order qty 23
Service level
100.0%
stockout risk now 19%
Unit price
Rp 16,999
PO history
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 168 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 614.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 8 functional locations

6 with criticality A/B · 104 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1334B
BOTTOM CONDENSER
A1682.36
PX_CL-617
QUENCH OIL COLUMN
A2452.52
PX_HE-1279B
C3 RECYCLE CONDENSER
A410.22
PX_KT-308B
TURBINE FOR KC-308B
A2401.10
PX_PP-956A
CAUSTIC PUMP
A1600.19
PY_LCV-1331
HE-1133B LEVEL CONTROL
A400.12
PX_LCV-359
HE-1888 LEVEL CONTROL
C1200.12
PX_KT-624A
TURBINE FOR KC-624A
S432.39

Lead time and procurement

Lead time 26 ± 15 days (PO history + category, 1 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
30 Aug 2025PR03
Regular replenishment
2Rp 16,99905 Oct 202536 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Sept 2026LowPX_CL-617Inspect CL-617 internal
28 Aug 2026MediumPX_HE-1334BInstall scaffolding at HE-1334B
05 Aug 2026MediumPX_CL-617Inspect CL-617 internal
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
07 May 2026MediumPX_HE-1334BInstall scaffolding at HE-1334B
29 Mar 2026MediumPX_HE-1334BHE-1334B tube leak
27 Mar 2026LowPX_CL-617CL-617 DP high
01 Mar 2026MediumPX_HE-1334BHE-1334B fouling
13 Feb 2026MediumPX_HE-1334B[MSI-B-26-MEX-353] Permanent repair
10 Feb 2026LowPX_HE-1334BLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
16 Apr 20268201000014761Corrective