STUDBOLT,1INX45MM,B8M/8M

Material 4100024988 · STUDBOLT · Plant 1000

ASafety-criticalReorderCriticalBelow reorder point
Material
4100024988
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 7 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
CAHAYA INDUSTRI SENTOSA PT
Lead time
30 d · P80 39 d
Unit price
Rp 18,353

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 159 EA/year: 159 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~30 days; expected demand during lead time 13.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 192, order up to 352.
  • 5.On hand 10 + on order 26 is at or below the reorder point: order 316 now.
  • 6.Installed on 7 FuncLoc(s), 5 of them criticality A/B.
  • 7.ML early warning: 38% probability of demand in the next 90 days.
Proposed purchase requisition
316 EA
Rp 5.8M · order by 01 Oct 2026
Expected arrival ≈ 30 days
Safety-critical (SCE)ML early warningSingle sourceOpen PO
On hand / on order
10 / 26
next delivery 21 Oct 2026
Today Min / Max
4 / 6
static parameters in BoM
Rec. Min (reorder point)
192
safety stock 179
Rec. Max
352
order qty 160
Service level
100.0%
stockout risk now 19%
Unit price
Rp 18,353
PO history
ML early warning: 38% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 122 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 533.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 7 functional locations

5 with criticality A/B · 96 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-247A
SLOP OIL FAN
A1694.00
PX_HE-895B
DEMIN WATER EXCHANGER
A2000.22
PX_KT-308B
TURBINE FOR KC-308B
A2001.10
PX_HE-578D
SEAL OIL TLE
B431.08
PX_PRV-1383B
SAFETY VALVE PP-1694A
B800.04
PX_12-HS-29818-A11A-H
PIPE-12 FROM PP-1262 TO HE-213B
C1200.01
PX_KT-778A
TURBINE FOR KC-778A
S1601.10

Lead time and procurement

Lead time 30 ± 15 days (PO history + category, 2 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
11 Sept 2026PR03
Regular replenishment
26Rp 17,93821 Oct 2026
open
40 d
18 Aug 2025PR06
Regular replenishment
41Rp 18,76830 Sept 202543 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Sept 2026MediumPX_HE-578DInstall scaffolding at HE-578D
27 Aug 2026HighPX_KC-247AInspect coupling KC-247A
14 Jul 2026MediumPX_KC-247AReplace lamp as per PM finding
29 Jun 2026LowPX_KC-247AKC-247A high vibration
04 Jun 2026LowPX_KC-247AKC-247A bearing temp high
14 Apr 2026MediumPX_HE-578DReplace lamp as per PM finding
06 Apr 2026MediumPX_KC-247AKC-247A bearing temp high
20 Nov 2025MediumPX_KC-247AReplace lamp as per PM finding
22 Aug 2025LowPX_KC-247AOverhaul
14 Aug 2025MediumPX_HE-578DHE-578D fouling

Recent goods issues

Posting dateQtyOrderOrder type
01 Jun 202696201000010191Corrective
28 Feb 202632201000023129Corrective