STUDBOLT,3/4INX35MM,B7/2H

Material 4100024990 · STUDBOLT · Plant 1000

ASafety-criticalReorderCriticalInsurance gap
Material
4100024990
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 8 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 40 EA/year: 40 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~23 days; expected demand during lead time 2.5.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 54, order up to 95.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 95 now.
  • 6.Installed on 8 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
95 EA
Rp 3.6M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
5 / 14
static parameters in BoM
Rec. Min (reorder point)
54
safety stock 52
Rec. Max
95
order qty 41
Service level
100.0%
stockout risk now 9%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 24 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 322.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 8 functional locations

6 with criticality A/B · 136 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A248230.86
PX_KC-317B
RICH AMINE FAN
A2441.85
PX_HE-1256A
REFLUX PREHEATER
A800.22
PX_PP-1049
PROPYLENE PUMP
A1600.19
PY_HE-1685D
QUENCH OIL CONDENSER
B2410.65
PX_TCV-1288
TEMPERATURE CONTROL VALVE
B1600.12
PX_PP-1872A
QUENCH WATER PUMP
S1241.90
PX_PRV-1103B
SAFETY VALVE HE-1603
S1220.90

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
15 Sept 2026MediumPX_BF-106Install cover plate BF-106
14 Sept 2026LowPX_BF-106Peep door broken BF-106
10 Sept 2026MediumPX_BF-106Replace burner tip BF-106
08 Sept 2026LowPX_BF-106Leak from packing
08 Sept 2026MediumPX_BF-106Painting BF-106
05 Sept 2026MediumPX_PRV-1103BRecertification PRV-1103B

Recent goods issues

Never issued in the 17-month history.