STUDBOLT,1INX40MM,B16/4

Material 4100025033 · STUDBOLT · Plant 1000

AReorderCriticalSlow-moving
Material
4100025033
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 6 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
29 d · P80 39 d
Unit price
Rp 8,612

Recommendation

  • 1.Forecast 53 EA/year: 50 unplanned (credibility blend: own history + installed-base prior) + 2.9 from the maintenance plan.
  • 2.Lead time ~29 days; expected demand during lead time 4.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 48, order up to 101.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 100 now.
  • 5.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
  • 6.ML early warning: 31% probability of demand in the next 90 days.
Proposed purchase requisition
100 EA
Rp 861,150 · order by 01 Oct 2026
Expected arrival ≈ 29 days
ML early warningSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
48
safety stock 45
Rec. Max
101
order qty 53
Service level
100.0%
stockout risk now 22%
Unit price
Rp 8,612
PO history
ML early warning: 31% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 267 days ago, 4 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 668.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 6 functional locations

5 with criticality A/B · 76 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-111
CRACKING FURNACE BF-111
A16239.01
PX_PP-387
INHIBITOR PUMP
A410.62
PX_PCV-493
PP-1280B PRESSURE CONTROL
A400.08
PX_PP-128C
COOLING WATER PUMP
B1200.19
PX_VD-410
DILUTION STEAM ACCUMULATOR
B2400.08
PX_HE-1675
SPENT CAUSTIC EXCHANGER
C1600.22

Lead time and procurement

Lead time 29 ± 15 days (PO history + category, 2 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
18 Mar 2026PR03
Regular replenishment
5Rp 8,64510 May 202653 d
31 Dec 2025PR06
Regular replenishment
5Rp 8,57824 Jan 202624 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_PCV-493Final Element Overhaul; Control Valve2.86

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
03 Aug 2026MediumPX_BF-111Thermograph wall BF-111
11 Jul 2026MediumPX_BF-111Thermograph wall BF-111
27 Jun 2026MediumPX_BF-111Leak from packing
08 May 2026MediumPX_BF-111Repair refractory crack BF-111
20 Apr 2026EmergencyPX_BF-111Cleaning burner BF-111
16 Apr 2026MediumPX_BF-111Replace lamp as per PM finding
20 Mar 2026MediumPX_BF-111Painting BF-111
06 Mar 2026LowPX_BF-111Install cover plate for MCP cracking

Recent goods issues

Posting dateQtyOrderOrder type
07 Jan 202616201000025203Corrective