STUDBOLT,1INX40MM,B16/4
Material 4100025033 · STUDBOLT · Plant 1000
AReorderCriticalSlow-moving
- Material
- 4100025033
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (5 of 6 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 29 d · P80 39 d
- Unit price
- Rp 8,612
Recommendation
- 1.Forecast 53 EA/year: 50 unplanned (credibility blend: own history + installed-base prior) + 2.9 from the maintenance plan.
- 2.Lead time ~29 days; expected demand during lead time 4.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 48, order up to 101.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 100 now.
- 5.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
- 6.ML early warning: 31% probability of demand in the next 90 days.
Proposed purchase requisition
100 EA
Rp 861,150 · order by 01 Oct 2026
Expected arrival ≈ 29 days
ML early warningSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
48
safety stock 45
Rec. Max
101
order qty 53
Service level
100.0%
stockout risk now 22%
Unit price
Rp 8,612
PO history
ML early warning: 31% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 267 days ago, 4 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 668.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 6 functional locations
5 with criticality A/B · 76 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-111 CRACKING FURNACE BF-111 | A | 16 | 23 | 9.01 |
| PX_PP-387 INHIBITOR PUMP | A | 4 | 1 | 0.62 |
| PX_PCV-493 PP-1280B PRESSURE CONTROL | A | 4 | 0 | 0.08 |
| PX_PP-128C COOLING WATER PUMP | B | 12 | 0 | 0.19 |
| PX_VD-410 DILUTION STEAM ACCUMULATOR | B | 24 | 0 | 0.08 |
| PX_HE-1675 SPENT CAUSTIC EXCHANGER | C | 16 | 0 | 0.22 |
Lead time and procurement
Lead time 29 ± 15 days (PO history + category, 2 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 18 Mar 2026 | PR03 Regular replenishment | 5 | Rp 8,645 | 10 May 2026 | 53 d |
| 31 Dec 2025 | PR06 Regular replenishment | 5 | Rp 8,578 | 24 Jan 2026 | 24 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Nov 2026 | PX_PCV-493 | Final Element Overhaul; Control Valve | 2.86 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 10 Sept 2026 | Medium | PX_BF-111 | Peep door broken BF-111 |
| 03 Aug 2026 | Medium | PX_BF-111 | Thermograph wall BF-111 |
| 11 Jul 2026 | Medium | PX_BF-111 | Thermograph wall BF-111 |
| 27 Jun 2026 | Medium | PX_BF-111 | Leak from packing |
| 08 May 2026 | Medium | PX_BF-111 | Repair refractory crack BF-111 |
| 20 Apr 2026 | Emergency | PX_BF-111 | Cleaning burner BF-111 |
| 16 Apr 2026 | Medium | PX_BF-111 | Replace lamp as per PM finding |
| 20 Mar 2026 | Medium | PX_BF-111 | Painting BF-111 |
| 06 Mar 2026 | Low | PX_BF-111 | Install cover plate for MCP cracking |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 07 Jan 2026 | 16 | 201000025203 | Corrective |