STUDBOLT,7/8INX110MM,B16/4

Material 4100025065 · STUDBOLT · Plant 1000

ASafety-criticalReorderNormalBelow reorder point
Material
4100025065
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 10 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
BUANA TEKNIK SENTOSA PT
Lead time
31 d · P80 55 d
Unit price
Rp 121,702

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 73 EA/year: 73 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~31 days; expected demand during lead time 6.3.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 104, order up to 178.
  • 5.On hand 33 + on order 32 is at or below the reorder point: order 113 now.
  • 6.Installed on 10 FuncLoc(s), 5 of them criticality A/B.
  • 7.ML early warning: 56% probability of demand in the next 90 days.
Proposed purchase requisition
113 EA
Rp 13.8M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Safety-critical (SCE)ML early warningSingle sourceOpen PO
On hand / on order
33 / 32
next delivery 21 Nov 2026
Today Min / Max
24 / 36
static parameters in BoM
Rec. Min (reorder point)
104
safety stock 98
Rec. Max
178
order qty 74
Service level
100.0%
stockout risk now 1%
Unit price
Rp 121,702
PO history
ML early warning: 56% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 162 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 302.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 10 functional locations

5 with criticality A/B · 124 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1125B
HYDROGEN PUMP
A820.62
PX_KC-621
SEAL OIL FAN
A800.57
PX_PP-1033
CAUSTIC PUMP
A800.19
PX_HE-182C
LEAN AMINE PREHEATER
B1210.22
PX_PP-682A
RECYCLE ETHANE PUMP
B2410.62
PX_FCV-870
PP-1748 OUTLET FLOW
C1620.54
PX_6-HS-18874-A22A-H
PIPE-6 FROM PP-1729A TO HE-902
C800.01
PX_KT-778A
TURBINE FOR KC-778A
S1601.10
PX_PRV-1576A
SAFETY VALVE PP-376A
S400.04
PX_PRV-182
SAFETY VALVE PP-507
S2000.04

Lead time and procurement

Lead time 31 ± 23 days (PO history, 3 PO lines) · on-time 29%

PR dateTypeQtyUnit priceDeliveryLead time
07 Sept 2026PR05
Project / turnaround
32Rp 118,42421 Nov 2026
open
75 d
01 May 2026PR03
Regular replenishment
35Rp 121,70227 May 202626 d
28 May 2025PR03
Regular replenishment
20Rp 122,19515 Jun 202518 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Aug 2026MediumPX_FCV-870[MSI-B-26-FHG-172/M] Replace line
03 Jan 2026MediumPX_PP-1125B[MSI-B-26-LES-336] Permanent repair
01 Jun 2025MediumPX_PP-682APP-682A seal leak
30 May 2025MediumPX_FCV-870FCV-870 passing
11 May 2025MediumPX_PP-1125BInstall scaffolding at PP-1125B
03 May 2025LowPX_HE-182CInstall scaffolding at HE-182C

Recent goods issues

Posting dateQtyOrderOrder type
22 Apr 20268204000033648Preventive
05 Jun 202596201000021753Corrective