STUDBOLT,1INX50MM,B16/4

Material 4100025085 · STUDBOLT · Plant 1000

AReorderNormalBelow reorder point
Material
4100025085
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 7 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Forecast 31 EA/year: 31 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~23 days; expected demand during lead time 1.9.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 40, order up to 71.
  • 4.On hand 22 + on order 0 is at or below the reorder point: order 49 now.
  • 5.Installed on 7 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
49 EA
Rp 1.9M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Price estimatedLead time estimated
On hand / on order
22 / 0
no open PO
Today Min / Max
19 / 40
static parameters in BoM
Rec. Min (reorder point)
40
safety stock 39
Rec. Max
71
order qty 31
Service level
100.0%
stockout risk now 0%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 10 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 330.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 7 functional locations

6 with criticality A/B · 108 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1166B
BFW PUMP
A2420.62
PX_HE-1921D
QUENCH OIL REBOILER
A1210.22
PX_KC-663A
CONDENSATE FAN
A2010.57
PX_HE-193B
FUEL OIL PREHEATER
B430.65
PX_PCV-1103
PRESSURE CONTROL VALVE
B2030.51
PX_HE-935A
LUBE OIL CONDENSER
B1600.22
PX_ROF-735
RESTRICTION ORIFICE
C1200.00

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 Sept 2026HighPX_HE-193BInstall scaffolding at HE-193B
26 Jun 2026MediumPX_PCV-1103PCV-1103; IA leak from regulator
16 Jun 2026LowPX_HE-193BLeak from packing
29 Sept 2025MediumPX_PCV-1103Install scaffolding at PCV-1103
23 Sept 2025LowPX_PP-1166BPP-1166B seal leak
14 May 2025LowPX_KC-663ALeak from packing
11 May 2025LowPX_HE-193BInstall scaffolding at HE-193B
09 May 2025MediumPX_PCV-1103[MSI-B-25-XXZ-362/M] Replace line
05 May 2025LowPX_HE-1921DLeak from packing
03 May 2025MediumPX_PP-1166B[MSI-B-25-MAP-379] Permanent repair

Recent goods issues

Posting dateQtyOrderOrder type
21 Sept 20268201000019252Corrective
02 Aug 202532201000008449Corrective