STUDBOLT,1INX30MM,B7/2H

Material 4100025145 · STUDBOLT · Plant 1000

AReorderCriticalStockout
Material
4100025145
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Forecast 82 EA/year: 82 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~23 days; expected demand during lead time 5.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 96, order up to 178.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 178 now.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
178 EA
Rp 6.7M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
4 / 10
static parameters in BoM
Rec. Min (reorder point)
96
safety stock 91
Rec. Max
178
order qty 82
Service level
100.0%
stockout risk now 10%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 187 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 366.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 3 functional locations

2 with criticality A/B · 48 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1506
FEED PUMP
A1272.76
PX_CL-894
COOLING WATER COLUMN
A1610.38
PX_PP-1872A
QUENCH WATER PUMP
S2041.90

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_PP-1506Replace bearing PP-1506
25 Aug 2026MediumPX_PP-1872AOil leak at PP-1872A bearing housing
17 Jul 2026LowPX_PP-1506PP-1506 seal leak
29 Apr 2026MediumPX_PP-1872APP-1872A discharge pressure low
10 Mar 2026LowPX_PP-1506Leak from packing
04 Mar 2026MediumPX_PP-1506Leak from packing
21 Feb 2026LowPX_PP-1506PP-1506 seal leak
23 Oct 2025MediumPX_PP-1506Oil leak at PP-1506 bearing housing
17 Sept 2025LowPX_PP-1872AReplace lamp as per PM finding
14 Jun 2025LowPX_PP-1872AOil leak at PP-1872A bearing housing

Recent goods issues

Posting dateQtyOrderOrder type
28 Mar 202648201000020224Corrective