STUDBOLT,1/2INX110MM,B8M/8M
Material 4100025156 · STUDBOLT · Plant 1000
AMonitorCritical insurance spare
- Material
- 4100025156
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B)
- Supplier
- MEGA TEKNOLOGI SENTOSA PT
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 35,820
Recommendation
- 1.Forecast 14 EA/year: 14 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~23 days; expected demand during lead time 0.9.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 27, order up to 54.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.No issue in 17 months, but it protects critical equipment: keep it.
- 6.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Insurance spare candidateSingle source
On hand / on order
4 / 0
no open PO
Today Min / Max
3 / 5
static parameters in BoM
Rec. Min (reorder point)
27
safety stock 27
Rec. Max
54
order qty 27
Service level
99.9%
stockout risk now 3%
Unit price
Rp 35,820
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 113.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 4 functional locations
3 with criticality A/B · 64 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-111 CRACKING FURNACE BF-111 | A | 20 | 23 | 9.01 |
| PX_PP-790A CHARGE GAS PUMP | A | 16 | 7 | 2.76 |
| PY_VD-262 BOTTOM ACCUMULATOR | B | 20 | 0 | 0.08 |
| PX_KT-778A TURBINE FOR KC-778A | S | 8 | 0 | 1.10 |
Lead time and procurement
Lead time 23 ± 15 days (PO history + category, 1 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 29 Jun 2026 | PR03 Regular replenishment | 1 | Rp 35,820 | 20 Jul 2026 | 21 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Sept 2026 | Medium | PX_PP-790A | PP-790A abnormal noise |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 10 Sept 2026 | Medium | PX_BF-111 | Peep door broken BF-111 |
| 03 Aug 2026 | Medium | PX_BF-111 | Thermograph wall BF-111 |
| 27 Jul 2026 | Medium | PX_PP-790A | Oil leak at PP-790A bearing housing |
| 23 Jul 2026 | High | PX_PP-790A | PP-790A seal leak |
| 11 Jul 2026 | Medium | PX_BF-111 | Thermograph wall BF-111 |
| 27 Jun 2026 | Medium | PX_BF-111 | Leak from packing |
| 08 May 2026 | Medium | PX_BF-111 | Repair refractory crack BF-111 |
| 20 Apr 2026 | Emergency | PX_BF-111 | Cleaning burner BF-111 |
Recent goods issues
Never issued in the 17-month history.