STUDBOLT,7/8INX45MM,B7/2H
Material 4100025162 · STUDBOLT · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100025162
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 96 EA/year: 96 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~23 days; expected demand during lead time 6.0.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 96, order up to 192.
- 4.On hand 18 + on order 0 is at or below the reorder point: order 174 now.
- 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
174 EA
Rp 6.6M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Price estimatedLead time estimated
On hand / on order
18 / 0
no open PO
Today Min / Max
10 / 23
static parameters in BoM
Rec. Min (reorder point)
96
safety stock 90
Rec. Max
192
order qty 96
Service level
99.8%
stockout risk now 6%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 356 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 214.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 3 functional locations
3 with criticality A/B · 16 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_VD-694A C3 RECYCLE ACCUMULATOR | A | 4 | 3 | 0.93 |
| PX_KC-588 CAUSTIC FAN | A | 4 | 2 | 1.00 |
| PX_HE-695A METHANOL TLE | B | 8 | 2 | 1.08 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Jun 2026 | Low | PX_VD-694A | Leak from packing |
| 22 Feb 2026 | Medium | PX_KC-588 | KC-588 lube oil filter DP high |
| 14 Nov 2025 | Medium | PX_HE-695A | [MSI-B-25-MUZ-221] Permanent repair |
| 01 Oct 2025 | Medium | PX_VD-694A | Inspect VD-694A |
| 24 Jun 2025 | Low | PX_HE-695A | HE-695A tube leak |
| 24 May 2025 | Medium | PX_KC-588 | Repair insulation KC-588 |
| 09 May 2025 | Medium | PX_VD-694A | PSM25/Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Oct 2025 | 96 | 201000006082 | Corrective |