STUDBOLT,3/4INX100MM,B16/4

Material 4100025189 · STUDBOLT · Plant 1000

AReorderCriticalStockout
Material
4100025189
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 9 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Forecast 96 EA/year: 96 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~23 days; expected demand during lead time 6.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 81, order up to 177.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 177 now.
  • 5.Installed on 9 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
177 EA
Rp 6.7M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Last turnaround used 48Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
11 / 16
static parameters in BoM
Rec. Min (reorder point)
81
safety stock 75
Rec. Max
177
order qty 96
Service level
100.0%
stockout risk now 20%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 27% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 48 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (48 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 770.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 9 functional locations

6 with criticality A/B · 144 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A2411442.86
PX_BF-106
CRACKING FURNACE BF-106
A168230.86
PX_BF-109
CRACKING FURNACE BF-109
A202911.58
PX_KC-778A
CONDENSATE COMPRESSOR
A831.43
PX_FCV-1863
BY PASS LINE
A400.11
PX_KC-178A
QUENCH OIL FAN
A2400.57
PX_LCV-603
HE-1524B LEVEL CONTROL
C800.12
PX_LCV-622
LEVEL CONTROL VALVE
C2400.12
PX_VD-1704
CAUSTIC ACCUMULATOR
C1600.08

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
15 Sept 2026MediumPX_BF-106Install cover plate BF-106
14 Sept 2026LowPX_BF-105Install cover plate BF-105

Recent goods issues

Posting dateQtyOrderOrder type
30 Nov 202548203000020446Turnaround