STUDBOLT,5/8INX55MM,B7/2H
Material 4100025316 · STUDBOLT · Plant 1000
ASafety-criticalReduceNon-moving
- Material
- 4100025316
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 7 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 4.6 EA/year: 4.6 unplanned (installed-base failure prior (no history)).
- 3.Lead time ~23 days; expected demand during lead time 0.3.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 27, order up to 54.
- 5.Stock 591 exceeds the level to keep (54) by 537.
- 6.Installed on 7 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
591 / 0
no open PO
Today Min / Max
10 / 19
static parameters in BoM
Rec. Min (reorder point)
27
safety stock 27
Rec. Max
54
order qty 27
Service level
100.0%
stockout risk now 0%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 37.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 7 functional locations
1 with criticality A/B · 72 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-419A TURBINE FOR KC-419A | A | 8 | 6 | 2.81 |
| PX_PCV-139 BY PASS DUCT | C | 16 | 2 | 0.94 |
| PX_PCV-837 BY PASS DUCT | C | 4 | 1 | 0.08 |
| PX_1-LS-26233-A11A PIPE-1 FROM VD-1230 TO PP-500 | C | 4 | 0 | 0.01 |
| PX_HE-163A METHANOL EXCHANGER | C | 12 | 0 | 0.22 |
| PX_FCV-1905D HE-163D OUTLET FLOW | S | 4 | 0 | 0.11 |
| PX_PRV-1875A SAFETY VALVE VD-1069 | S | 24 | 0 | 0.04 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Apr 2026 | Medium | PX_PCV-139 | Overhaul PCV-139 |
| 03 Apr 2026 | Medium | PX_KT-419A | KT-419A steam leak at gland |
| 17 Mar 2026 | Medium | PX_KT-419A | Install cover plate for MCP cracking |
| 20 Nov 2025 | Medium | PX_KT-419A | Leak from packing |
| 10 Nov 2025 | Medium | PX_KT-419A | Painting KT-419A |
| 03 Sept 2025 | Medium | PX_KT-419A | Follow up after steam upset KT-419A |
| 17 Jun 2025 | Medium | PX_PCV-139 | [MSI-B-25-ZRC-367/M] Replace line |
| 16 May 2025 | Low | PX_PCV-837 | PCV-837; IA leak from regulator |
| 15 May 2025 | Low | PX_KT-419A | PSM25/Leak from packing |
Recent goods issues
Never issued in the 17-month history.