Sparely
DU

STUDBOLT,1INX80MM,B8M/8M

Material 4100025351 · STUDBOLT · Plant 1000

AReorderCriticalStockout
Material
4100025351
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
BINTANG MESINDO PRATAMA PT
Lead time
25 d · P80 39 d
Unit price
Rp 48,217

Recommendation

  • 1.Forecast 87 EA/year: 72 unplanned (credibility blend: own history + installed-base prior) + 14 from the maintenance plan.
  • 2.Lead time ~25 days; expected demand during lead time 4.9.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 64, order up to 151.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 151 now.
  • 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
151 EA
Rp 7.3M · order by 01 Oct 2026
Expected arrival ≈ 25 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
3 / 7
static parameters in BoM
Rec. Min (reorder point)
64
safety stock 60
Rec. Max
151
order qty 87
Service level
99.9%
stockout risk now 14%
Unit price
Rp 48,217
PO history
ML early warning: 24% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 434 days ago, 3 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 485.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 5 functional locations

4 with criticality A/B · 64 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1500B
SEAL OIL CONDENSER
A873.22
PX_HE-538B
GASOLINE REBOILER
A1220.65
PX_HE-184B
RECYCLE ETHANE COOLER
A1600.22
PX_HE-1874C
METHANOL COOLER
B831.08
PX_KT-264A
TURBINE FOR KC-264A
S2042.39

Lead time and procurement

Lead time 25 ± 15 days (PO history + category, 1 PO lines) · on-time 49%

PR dateTypeQtyUnit priceDeliveryLead time
25 Feb 2026PR03
Regular replenishment
11Rp 48,21727 Mar 202630 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul14.3

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Aug 2026HighPX_HE-1500BCleaning HE-1500B
12 Jul 2026MediumPX_HE-1500BRetubing HE-1500B
08 Jul 2026MediumPX_HE-1874CReplace lamp as per PM finding
11 Jun 2026LowPX_KT-264ALeak from packing
06 May 2026HighPX_HE-1500BLeak from packing
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
16 Mar 2026LowPX_HE-1500BLeak from packing
03 Mar 2026MediumPX_HE-1874CLeak from packing
19 Feb 2026HighPX_HE-538BHE-538B tube leak
30 Jan 2026LowPX_HE-1500BLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
24 Jul 202532201000017136Corrective