Sparely
DU

STUDBOLT,1/2INX50MM,B7/2H

Material 4100025354 · STUDBOLT · Plant 1000

AReorderNormalSlow-moving
Material
4100025354
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
SAMUDRA SEJAHTERA INTERNASIONAL PT
Lead time
21 d · P80 39 d
Unit price
Rp 105,341

Recommendation

  • 1.Forecast 192 EA/year: 192 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~21 days; expected demand during lead time 11.
  • 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 96, order up to 262.
  • 4.On hand 88 + on order 0 is at or below the reorder point: order 174 now.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
174 EA
Rp 18.3M · order by 01 Oct 2026
Expected arrival ≈ 21 days
Single source
On hand / on order
88 / 0
no open PO
Today Min / Max
19 / 36
static parameters in BoM
Rec. Min (reorder point)
96
safety stock 86
Rec. Max
262
order qty 166
Service level
99.4%
stockout risk now 11%
Unit price
Rp 105,341
PO history
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 216 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 430.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 3 functional locations

2 with criticality A/B · 20 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-308B
TURBINE FOR KC-308B
A401.10
PX_HE-495C
CAUSTIC TLE
B400.22
PX_KC-538
REFLUX BLOWER
S12124.85

Lead time and procurement

Lead time 21 ± 15 days (PO history + category, 2 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
17 Apr 2026PR03
Regular replenishment
27Rp 102,33006 May 202619 d
24 Oct 2025PR06
Regular replenishment
34Rp 108,35209 Nov 202516 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026EmergencyPX_KC-538KC-538 high vibration
16 Sept 2026EmergencyPX_KC-538Leak from packing
01 Sept 2026MediumPX_KC-538KC-538 lube oil filter DP high
01 Sept 2026MediumPX_KC-538KC-538 high vibration
11 Jun 2026MediumPX_KC-538Leak from packing
07 May 2026MediumPX_KC-538KC-538 bearing temp high
12 Apr 2026MediumPX_KC-538KC-538 high vibration
04 Apr 2026MediumPX_KC-538Leak from packing
30 Mar 2026MediumPX_KC-538KC-538 high vibration
01 Oct 2025MediumPX_KC-538Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
27 Feb 202696204000007389Preventive