STUDBOLT,1/2INX50MM,B7/2H
Material 4100025354 · STUDBOLT · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100025354
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- SAMUDRA SEJAHTERA INTERNASIONAL PT
- Lead time
- 21 d · P80 39 d
- Unit price
- Rp 105,341
Recommendation
- 1.Forecast 192 EA/year: 192 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~21 days; expected demand during lead time 11.
- 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 96, order up to 262.
- 4.On hand 88 + on order 0 is at or below the reorder point: order 174 now.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
174 EA
Rp 18.3M · order by 01 Oct 2026
Expected arrival ≈ 21 days
Single source
On hand / on order
88 / 0
no open PO
Today Min / Max
19 / 36
static parameters in BoM
Rec. Min (reorder point)
96
safety stock 86
Rec. Max
262
order qty 166
Service level
99.4%
stockout risk now 11%
Unit price
Rp 105,341
PO history
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 216 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 430.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 3 functional locations
2 with criticality A/B · 20 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-308B TURBINE FOR KC-308B | A | 4 | 0 | 1.10 |
| PX_HE-495C CAUSTIC TLE | B | 4 | 0 | 0.22 |
| PX_KC-538 REFLUX BLOWER | S | 12 | 12 | 4.85 |
Lead time and procurement
Lead time 21 ± 15 days (PO history + category, 2 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 17 Apr 2026 | PR03 Regular replenishment | 27 | Rp 102,330 | 06 May 2026 | 19 d |
| 24 Oct 2025 | PR06 Regular replenishment | 34 | Rp 108,352 | 09 Nov 2025 | 16 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 24 Sept 2026 | Emergency | PX_KC-538 | KC-538 high vibration |
| 16 Sept 2026 | Emergency | PX_KC-538 | Leak from packing |
| 01 Sept 2026 | Medium | PX_KC-538 | KC-538 lube oil filter DP high |
| 01 Sept 2026 | Medium | PX_KC-538 | KC-538 high vibration |
| 11 Jun 2026 | Medium | PX_KC-538 | Leak from packing |
| 07 May 2026 | Medium | PX_KC-538 | KC-538 bearing temp high |
| 12 Apr 2026 | Medium | PX_KC-538 | KC-538 high vibration |
| 04 Apr 2026 | Medium | PX_KC-538 | Leak from packing |
| 30 Mar 2026 | Medium | PX_KC-538 | KC-538 high vibration |
| 01 Oct 2025 | Medium | PX_KC-538 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Feb 2026 | 96 | 204000007389 | Preventive |