STUDBOLT,5/8INX80MM,B7/2H

Material 4100025366 · STUDBOLT · Plant 1000

AReorderCriticalStockout
Material
4100025366
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
ANUGRAH PERKASA MAKMUR PT
Lead time
17 d · P80 12 d
Unit price
Rp 59,593

Recommendation

  • 1.Forecast 75 EA/year: 75 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~17 days; expected demand during lead time 3.5.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 152, order up to 304.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 304 now.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
304 EA
Rp 18.1M · order by 01 Oct 2026
Expected arrival ≈ 17 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
43 / 76
static parameters in BoM
Rec. Min (reorder point)
152
safety stock 149
Rec. Max
304
order qty 152
Service level
100.0%
stockout risk now 2%
Unit price
Rp 59,593
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 347 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 106.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 2 functional locations

2 with criticality A/B · 44 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-645A
SLOP OIL PUMP
A2020.62
PX_PP-1225B
INHIBITOR PUMP
B2420.62

Lead time and procurement

Lead time 17 ± 9 days (PO history, 3 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
09 Oct 2025PR03
Regular replenishment
45Rp 60,61619 Oct 202510 d
28 Aug 2025PR06
Regular replenishment
51Rp 57,35811 Sept 202514 d
01 Aug 2025PR03
Regular replenishment
36Rp 59,59308 Aug 20257 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Mar 2026EmergencyPX_PP-1225B[MSI-B-26-WTG-155/M] Replace line
17 Nov 2025MediumPX_PP-645AReplace bearing PP-645A
25 May 2025MediumPX_PP-1225BPSM25/[MSI-B-25-KAT-363/M] Replace line
24 May 2025MediumPX_PP-645APP-645A seal leak

Recent goods issues

Posting dateQtyOrderOrder type
19 Oct 202596201000017071Corrective
19 Oct 202524201000017071Corrective
19 Oct 202532201000017071Corrective