STUDBOLT,5/8INX75MM,B8M/8M
Material 4100025380 · STUDBOLT · Plant 1000
AReduceSlow-moving
- Material
- 4100025380
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 22 EA/year: 22 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~23 days; expected demand during lead time 1.4.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 42, order up to 84.
- 4.Stock 241 exceeds the level to keep (84) by 157.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
241 / 0
no open PO
Today Min / Max
42 / 123
static parameters in BoM
Rec. Min (reorder point)
42
safety stock 41
Rec. Max
84
order qty 42
Service level
99.9%
stockout risk now 0%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 488 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 111.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 3 functional locations
2 with criticality A/B · 48 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-533 TEMPERATURE CONTROL VALVE | A | 4 | 2 | 0.55 |
| PX_HE-344D BFW PREHEATER | B | 20 | 1 | 0.65 |
| PX_VD-992 SEAL OIL DRUM | C | 24 | 0 | 0.08 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Apr 2026 | Medium | PX_TCV-533 | Overhaul TCV-533 |
| 18 Jun 2025 | Medium | PX_HE-344D | HE-344D tube leak |
| 29 May 2025 | Low | PX_TCV-533 | Overhaul TCV-533 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 31 May 2025 | 4 | 201000006785 | Corrective |
| 29 May 2025 | 48 | 201000006785 | Corrective |
| 29 May 2025 | 32 | 201000006785 | Corrective |