STUDBOLT,5/8INX110MM,B7/2H

Material 4100025384 · STUDBOLT · Plant 1000

AReorderNormalBelow reorder point
Material
4100025384
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Forecast 77 EA/year: 77 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~23 days; expected demand during lead time 4.9.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 128, order up to 206.
  • 4.On hand 39 + on order 0 is at or below the reorder point: order 167 now.
  • 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
167 EA
Rp 6.3M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Price estimatedLead time estimated
On hand / on order
39 / 0
no open PO
Today Min / Max
7 / 20
static parameters in BoM
Rec. Min (reorder point)
128
safety stock 124
Rec. Max
206
order qty 78
Service level
100.0%
stockout risk now 7%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 158 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 259.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 5 functional locations

4 with criticality A/B · 60 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-513
TURBINE FOR KC-513
A821.53
PY_VD-1557A
RICH AMINE SEPARATOR
A420.08
PY_VD-1610
CONDENSATE ACCUMULATOR
B810.08
PX_FCV-1244C
WASH WATER FLOW CONTROL
B2400.11
PX_HE-287
CAUSTIC REBOILER
C1600.22

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Aug 2026EmergencyPY_VD-1557AInstall scaffolding at VD-1557A
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting
21 May 2025MediumPY_VD-1557APainting VD-1557A
14 May 2025LowPY_VD-1610Inspect VD-1610
03 May 2025MediumPX_KT-513KT-513 governor valve hunting

Recent goods issues

Posting dateQtyOrderOrder type
26 Apr 202696201000039303Corrective
11 Feb 202632201000032040Corrective