STUDBOLT,5/8INX110MM,B7/2H
Material 4100025384 · STUDBOLT · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100025384
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 77 EA/year: 77 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~23 days; expected demand during lead time 4.9.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 128, order up to 206.
- 4.On hand 39 + on order 0 is at or below the reorder point: order 167 now.
- 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
167 EA
Rp 6.3M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Price estimatedLead time estimated
On hand / on order
39 / 0
no open PO
Today Min / Max
7 / 20
static parameters in BoM
Rec. Min (reorder point)
128
safety stock 124
Rec. Max
206
order qty 78
Service level
100.0%
stockout risk now 7%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 158 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 259.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 5 functional locations
4 with criticality A/B · 60 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-513 TURBINE FOR KC-513 | A | 8 | 2 | 1.53 |
| PY_VD-1557A RICH AMINE SEPARATOR | A | 4 | 2 | 0.08 |
| PY_VD-1610 CONDENSATE ACCUMULATOR | B | 8 | 1 | 0.08 |
| PX_FCV-1244C WASH WATER FLOW CONTROL | B | 24 | 0 | 0.11 |
| PX_HE-287 CAUSTIC REBOILER | C | 16 | 0 | 0.22 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 13 Aug 2026 | Emergency | PY_VD-1557A | Install scaffolding at VD-1557A |
| 04 Jan 2026 | Medium | PX_KT-513 | KT-513 governor valve hunting |
| 21 May 2025 | Medium | PY_VD-1557A | Painting VD-1557A |
| 14 May 2025 | Low | PY_VD-1610 | Inspect VD-1610 |
| 03 May 2025 | Medium | PX_KT-513 | KT-513 governor valve hunting |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Apr 2026 | 96 | 201000039303 | Corrective |
| 11 Feb 2026 | 32 | 201000032040 | Corrective |