STUDBOLT,1INX30MM,B16/4

Material 4100025390 · STUDBOLT · Plant 1000

AReorderNormalSlow-moving
Material
4100025390
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (8 of 9 FuncLocs A/B)
Supplier
BINTANG PERKASA ABADI PT
Lead time
30 d · P80 43 d
Unit price
Rp 16,552

Recommendation

  • 1.Forecast 48 EA/year: 36 unplanned (credibility blend: own history + installed-base prior) + 11 from the maintenance plan.
  • 2.Lead time ~30 days; expected demand during lead time 2.9.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 40, order up to 88.
  • 4.On hand 6 + on order 0 is at or below the reorder point: order 82 now.
  • 5.Installed on 9 FuncLoc(s), 8 of them criticality A/B.
  • 6.ML early warning: 73% probability of demand in the next 90 days.
Proposed purchase requisition
82 EA
Rp 1.4M · order by 01 Oct 2026
Expected arrival ≈ 30 days
ML early warningSingle source
On hand / on order
6 / 0
no open PO
Today Min / Max
5 / 13
static parameters in BoM
Rec. Min (reorder point)
40
safety stock 38
Rec. Max
88
order qty 48
Service level
100.0%
stockout risk now 20%
Unit price
Rp 16,552
PO history
ML early warning: 73% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 259 days ago, 4 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 581.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 9 functional locations

8 with criticality A/B · 136 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1483A
C4 PRODUCT COOLER
A24113.22
PX_KC-854C
FEED FAN
A2472.28
PX_KT-856A
TURBINE FOR KC-856A
A1272.81
PX_KC-235D
DEMIN WATER FAN
A1621.00
PX_HE-1703C
METHANOL PREHEATER
A2000.22
PX_LCV-1703
PP-1325 LEVEL CONTROL
A400.12
PX_FCV-1963B
BY PASS LINE
B2000.11
PX_LCV-1053C
HE-1091 LEVEL CONTROL
B400.12
PX_FCV-381
C3 RECYCLE FLOW CONTROL
C1220.54

Lead time and procurement

Lead time 30 ± 13 days (PO history, 3 PO lines) · on-time 45%

PR dateTypeQtyUnit priceDeliveryLead time
09 Jun 2026PR03
Regular replenishment
10Rp 16,77220 Jul 202641 d
01 Jan 2026PR03
Regular replenishment
14Rp 16,17124 Jan 202623 d
19 Jun 2025PR06
Regular replenishment
14Rp 16,55203 Aug 202545 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_KC-235DCompressor major overhaul11.5

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026MediumPX_HE-1483AHE-1483A fouling
22 Sept 2026MediumPX_KC-854COverhaul
21 Aug 2026LowPX_HE-1483AReplace lamp as per PM finding
29 Jul 2026MediumPX_KC-854CInstall scaffolding at KC-854C
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
17 Jul 2026LowPX_KC-854CPainting KC-854C
15 Jul 2026LowPX_HE-1483APainting HE-1483A
28 Jun 2026HighPX_HE-1483ALeak from packing
08 Apr 2026MediumPX_HE-1483AHE-1483A tube leak
04 Apr 2026MediumPX_HE-1483ARetubing HE-1483A

Recent goods issues

Posting dateQtyOrderOrder type
15 Jan 20268201000014196Corrective
15 Dec 202524201000020854Corrective
30 Sept 20258201000015617Corrective