STUDBOLT,7/8INX85MM,B7/2H
Material 4100025412 · STUDBOLT · Plant 1000
AMonitorCritical insurance spare
- Material
- 4100025412
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 1.6 EA/year: 1.6 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~23 days; expected demand during lead time 0.1.
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 27.
- 4.No issue in 17 months, but it protects critical equipment: keep it.
- 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
9 / 0
no open PO
Today Min / Max
5 / 12
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
27
order qty 27
Service level
99.6%
stockout risk now 0%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 12.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 4 functional locations
3 with criticality A/B · 44 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-894 COOLING WATER COLUMN | A | 16 | 1 | 0.38 |
| PX_VD-1778 COOLING WATER ACCUMULATOR | A | 12 | 0 | 0.08 |
| PX_LCV-381 LEVEL CONTROL VALVE | B | 12 | 3 | 0.97 |
| PX_10-HS-13859-A41A-H PIPE-10 FROM PP-743D TO HE-1822A | C | 4 | 0 | 0.01 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Aug 2026 | Medium | PX_LCV-381 | LCV-381; valve hunting |
| 03 Apr 2026 | Low | PX_LCV-381 | Overhaul LCV-381 |
| 23 May 2025 | High | PX_LCV-381 | Replace lamp as per PM finding |
| 09 May 2025 | Medium | PX_CL-894 | Replace lamp as per PM finding |
Recent goods issues
Never issued in the 17-month history.