STUDBOLT,5/8INX55MM,B16/4

Material 4100025463 · STUDBOLT · Plant 1000

BReorderCriticalStockout
Material
4100025463
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 3 FuncLocs A/B)
Supplier
BERKAH ENERGI MAKMUR PT
Lead time
20 d · P80 39 d
Unit price
Rp 45,866

Recommendation

  • 1.Forecast 8.2 EA/year: 8.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~20 days; expected demand during lead time 0.5.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 21.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 21 now.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
21 EA
Rp 963,186 · order by 01 Oct 2026
Expected arrival ≈ 20 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 12
Rec. Max
21
order qty 9
Service level
100.0%
stockout risk now 7%
Unit price
Rp 45,866
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 181 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 74.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~10 days.

Installed on 3 functional locations

1 with criticality A/B · 28 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-1326
SEAL OIL STRIPPER
B451.23
PX_CL-101
ETHYLENE COLUMN
S420.81
PX_KC-150A
HYDROGEN FAN
S2021.00

Lead time and procurement

Lead time 20 ± 15 days (PO history + category, 2 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
13 May 2026PR06
Regular replenishment
5Rp 44,71903 Jun 202621 d
07 Sept 2025PR03
Regular replenishment
3Rp 47,01318 Sept 202511 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Aug 2026HighPX_CL-1326Install scaffolding at CL-1326
14 Aug 2026MediumPX_CL-1326Leak from packing
13 Apr 2026MediumPX_CL-101Leak from packing
01 Mar 2026MediumPX_CL-1326Install scaffolding at CL-1326
22 Nov 2025LowPX_CL-1326Inspect CL-1326 internal
21 Nov 2025MediumPX_KC-150AKC-150A bearing temp high
29 May 2025MediumPX_CL-1326PSM25/CL-1326 DP high
21 May 2025LowPX_KC-150APSM25/Leak from packing
11 May 2025MediumPX_CL-101Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
03 Apr 20268201000013208Corrective
22 Jan 20264201000012637Corrective