STUDBOLT,5/8INX55MM,B16/4
Material 4100025463 · STUDBOLT · Plant 1000
BReorderCriticalStockout
- Material
- 4100025463
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 3 FuncLocs A/B)
- Supplier
- BERKAH ENERGI MAKMUR PT
- Lead time
- 20 d · P80 39 d
- Unit price
- Rp 45,866
Recommendation
- 1.Forecast 8.2 EA/year: 8.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~20 days; expected demand during lead time 0.5.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 21.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 21 now.
- 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
21 EA
Rp 963,186 · order by 01 Oct 2026
Expected arrival ≈ 20 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 12
Rec. Max
21
order qty 9
Service level
100.0%
stockout risk now 7%
Unit price
Rp 45,866
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 181 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 74.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~10 days.
Installed on 3 functional locations
1 with criticality A/B · 28 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-1326 SEAL OIL STRIPPER | B | 4 | 5 | 1.23 |
| PX_CL-101 ETHYLENE COLUMN | S | 4 | 2 | 0.81 |
| PX_KC-150A HYDROGEN FAN | S | 20 | 2 | 1.00 |
Lead time and procurement
Lead time 20 ± 15 days (PO history + category, 2 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 13 May 2026 | PR06 Regular replenishment | 5 | Rp 44,719 | 03 Jun 2026 | 21 d |
| 07 Sept 2025 | PR03 Regular replenishment | 3 | Rp 47,013 | 18 Sept 2025 | 11 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Aug 2026 | High | PX_CL-1326 | Install scaffolding at CL-1326 |
| 14 Aug 2026 | Medium | PX_CL-1326 | Leak from packing |
| 13 Apr 2026 | Medium | PX_CL-101 | Leak from packing |
| 01 Mar 2026 | Medium | PX_CL-1326 | Install scaffolding at CL-1326 |
| 22 Nov 2025 | Low | PX_CL-1326 | Inspect CL-1326 internal |
| 21 Nov 2025 | Medium | PX_KC-150A | KC-150A bearing temp high |
| 29 May 2025 | Medium | PX_CL-1326 | PSM25/CL-1326 DP high |
| 21 May 2025 | Low | PX_KC-150A | PSM25/Leak from packing |
| 11 May 2025 | Medium | PX_CL-101 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Apr 2026 | 8 | 201000013208 | Corrective |
| 22 Jan 2026 | 4 | 201000012637 | Corrective |