STUDBOLT,1/2INX115MM,B8M/8M

Material 4100025472 · STUDBOLT · Plant 1000

ASafety-criticalReorderNormalBelow reorder point
Material
4100025472
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 7.1 EA/year: 7.1 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~23 days; expected demand during lead time 0.4.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 24.
  • 5.On hand 2 + on order 0 is at or below the reorder point: order 22 now.
  • 6.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
22 EA
Rp 831,754 · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 12
Rec. Max
24
order qty 12
Service level
99.9%
stockout risk now 4%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 169 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 127.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 3 functional locations

2 with criticality A/B · 56 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1598B
FUEL OIL PUMP
A2431.05
PX_PRV-1630
SAFETY VALVE KC-178A
A800.04
PX_ROF-614
MP STEAM TO HE-1217C
C2400.00

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Apr 2026LowPX_PP-1598BLeak from packing
29 Mar 2026MediumPX_PP-1598BReplace bearing PP-1598B
25 May 2025LowPX_PP-1598BLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
15 Apr 202612201000003083Corrective