STUDBOLT,1/2INX115MM,B8M/8M
Material 4100025472 · STUDBOLT · Plant 1000
ASafety-criticalReorderNormalBelow reorder point
- Material
- 4100025472
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 7.1 EA/year: 7.1 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~23 days; expected demand during lead time 0.4.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 24.
- 5.On hand 2 + on order 0 is at or below the reorder point: order 22 now.
- 6.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
22 EA
Rp 831,754 · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 12
Rec. Max
24
order qty 12
Service level
99.9%
stockout risk now 4%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 169 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 127.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 3 functional locations
2 with criticality A/B · 56 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1598B FUEL OIL PUMP | A | 24 | 3 | 1.05 |
| PX_PRV-1630 SAFETY VALVE KC-178A | A | 8 | 0 | 0.04 |
| PX_ROF-614 MP STEAM TO HE-1217C | C | 24 | 0 | 0.00 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Apr 2026 | Low | PX_PP-1598B | Leak from packing |
| 29 Mar 2026 | Medium | PX_PP-1598B | Replace bearing PP-1598B |
| 25 May 2025 | Low | PX_PP-1598B | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 15 Apr 2026 | 12 | 201000003083 | Corrective |