STUDBOLT,3/4INX50MM,B7/2H

Material 4100025503 · STUDBOLT · Plant 1000

ASafety-criticalReorderNormalSlow-moving
Material
4100025503
Category
STUDBOLT
Base unit
EA
MRP type
Non Stock
Criticality
A (5 of 5 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
BERKAH ENERGI MAKMUR PT
Lead time
32 d · P80 39 d
Unit price
Rp 101,104

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 5.3 EA/year: 5.3 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~32 days; expected demand during lead time 0.5.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 24.
  • 5.On hand 8 + on order 0 is at or below the reorder point: order 16 now.
  • 6.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
16 EA
Rp 1.6M · order by 01 Oct 2026
Expected arrival ≈ 32 days
Safety-critical (SCE)Single source
On hand / on order
8 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 12
Rec. Max
24
order qty 12
Service level
99.9%
stockout risk now 4%
Unit price
Rp 101,104
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 290 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 95.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 5 functional locations

5 with criticality A/B · 64 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-1833
CHARGE GAS COLUMN
A1200.38
PX_HE-1070
CONDENSATE REBOILER
A400.22
PX_HE-589D
SEAL OIL PREHEATER
A1600.22
PX_PCV-1509
BY PASS DUCT
B1200.08
PX_PRV-248
SAFETY VALVE VD-1282
B2000.04

Lead time and procurement

Lead time 32 ± 15 days (PO history + category, 2 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
27 Feb 2026PR03
Regular replenishment
1Rp 105,25305 Apr 202637 d
07 Jan 2026PR03
Regular replenishment
2Rp 96,95502 Mar 202654 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
15 Dec 202512201000016053Corrective