STUDBOLT,3/4INX50MM,B7/2H
Material 4100025503 · STUDBOLT · Plant 1000
ASafety-criticalReorderNormalSlow-moving
- Material
- 4100025503
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (5 of 5 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- BERKAH ENERGI MAKMUR PT
- Lead time
- 32 d · P80 39 d
- Unit price
- Rp 101,104
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 5.3 EA/year: 5.3 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~32 days; expected demand during lead time 0.5.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 24.
- 5.On hand 8 + on order 0 is at or below the reorder point: order 16 now.
- 6.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
16 EA
Rp 1.6M · order by 01 Oct 2026
Expected arrival ≈ 32 days
Safety-critical (SCE)Single source
On hand / on order
8 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 12
Rec. Max
24
order qty 12
Service level
99.9%
stockout risk now 4%
Unit price
Rp 101,104
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 290 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 95.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 5 functional locations
5 with criticality A/B · 64 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-1833 CHARGE GAS COLUMN | A | 12 | 0 | 0.38 |
| PX_HE-1070 CONDENSATE REBOILER | A | 4 | 0 | 0.22 |
| PX_HE-589D SEAL OIL PREHEATER | A | 16 | 0 | 0.22 |
| PX_PCV-1509 BY PASS DUCT | B | 12 | 0 | 0.08 |
| PX_PRV-248 SAFETY VALVE VD-1282 | B | 20 | 0 | 0.04 |
Lead time and procurement
Lead time 32 ± 15 days (PO history + category, 2 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 27 Feb 2026 | PR03 Regular replenishment | 1 | Rp 105,253 | 05 Apr 2026 | 37 d |
| 07 Jan 2026 | PR03 Regular replenishment | 2 | Rp 96,955 | 02 Mar 2026 | 54 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 15 Dec 2025 | 12 | 201000016053 | Corrective |