STUDBOLT,7/8INX30MM,B16/4
Material 4100025541 · STUDBOLT · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100025541
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 4.7 EA/year: 4.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~23 days; expected demand during lead time 0.3.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 13.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 11 now.
- 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
11 EA
Rp 415,877 · order by 01 Oct 2026
Expected arrival ≈ 23 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 8
Rec. Max
13
order qty 5
Service level
100.0%
stockout risk now 7%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 357 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 250.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 5 functional locations
3 with criticality A/B · 44 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-713B SPENT CAUSTIC FAN | A | 4 | 6 | 3.14 |
| PX_PP-1269A C4 PRODUCT PUMP | A | 4 | 0 | 0.19 |
| PX_VD-1840 METHANOL KO DRUM | B | 4 | 0 | 0.08 |
| PX_FCV-421 SPENT CAUSTIC FLOW CONTROL | C | 12 | 0 | 0.11 |
| PX_PCV-230 HE-729B PRESSURE CONTROL | C | 20 | 0 | 0.08 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 17 Jun 2026 | Low | PX_KC-713B | Leak from packing |
| 12 Jun 2026 | High | PX_KC-713B | Inspect coupling KC-713B |
| 08 Apr 2026 | Medium | PX_KC-713B | Inspect coupling KC-713B |
| 13 Oct 2025 | Emergency | PX_KC-713B | Leak from packing |
| 29 Aug 2025 | Low | PX_KC-713B | Leak from packing |
| 18 Jul 2025 | Medium | PX_KC-713B | Overhaul |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 Oct 2025 | 4 | 201000039433 | Corrective |