STUDBOLT,3/4INX115MM,B7/2H

Material 4100025547 · STUDBOLT · Plant 1000

ASafety-criticalReduceNon-moving
Material
4100025547
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 4 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 16 EA/year: 16 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~23 days; expected demand during lead time 1.0.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 27, order up to 54.
  • 5.Stock 77 exceeds the level to keep (54) by 23.
  • 6.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
77 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
27
safety stock 26
Rec. Max
54
order qty 27
Service level
99.9%
stockout risk now 0%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 11 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 128.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 4 functional locations

3 with criticality A/B · 76 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-104
CRACKING FURNACE BF-104
A162811.58
PX_PP-882A
CONDENSATE PUMP
A2010.62
PX_PRV-1606B
SAFETY VALVE HE-1422A
A2000.04
PX_KT-624A
TURBINE FOR KC-624A
S2032.39

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking
04 Sept 2026MediumPX_BF-104Replace burner tip BF-104
01 Sept 2026MediumPX_BF-104Install scaffolding at BF-104
29 Aug 2026HighPX_BF-104Leak from packing
08 Aug 2026LowPX_BF-104[MSI-B-26-MZB-191] Permanent repair
04 Aug 2026MediumPX_BF-104Thermograph wall BF-104
04 Aug 2026MediumPX_BF-104Peep door broken BF-104
21 Jul 2026MediumPX_BF-104Hot spot at convection BF-104

Recent goods issues

Never issued in the 17-month history.