STUDBOLT,7/8INX95MM,B16/4
Material 4100025605 · STUDBOLT · Plant 1000
AReduceSlow-moving
- Material
- 4100025605
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- SAMUDRA SEJAHTERA INTERNASIONAL PT
- Lead time
- 38 d · P80 39 d
- Unit price
- Rp 22,427
Recommendation
- 1.Forecast 24 EA/year: 24 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~38 days; expected demand during lead time 2.6.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 96, order up to 192.
- 4.Stock 1,471 exceeds the level to keep (192) by 1,279.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Single source
On hand / on order
1,471 / 0
no open PO
Today Min / Max
26 / 75
static parameters in BoM
Rec. Min (reorder point)
96
safety stock 94
Rec. Max
192
order qty 96
Service level
100.0%
stockout risk now 0%
Unit price
Rp 22,427
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 270 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 54.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 1 functional locations
1 with criticality A/B · 12 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-708A SLOP OIL COOLER | A | 12 | 1 | 0.22 |
Lead time and procurement
Lead time 38 ± 15 days (PO history + category, 2 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 11 Feb 2026 | PR06 Regular replenishment | 34 | Rp 22,073 | 20 Apr 2026 | 68 d |
| 17 Dec 2025 | PR06 Regular replenishment | 17 | Rp 22,781 | 09 Feb 2026 | 54 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 02 May 2025 | Medium | PX_HE-708A | Cleaning HE-708A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 04 Jan 2026 | 96 | 201000019978 | Corrective |