STUDBOLT,1/2INX30MM,B16/4

Material 4100025621 · STUDBOLT · Plant 1000

AMonitorHealthy
Material
4100025621
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
KARYA UTAMA GLOBAL PT
Lead time
22 d · P80 24 d
Unit price
Rp 83,751

Recommendation

  • 1.Forecast 40 EA/year: 31 unplanned (credibility blend: own history + installed-base prior) + 8.6 from the maintenance plan.
  • 2.Lead time ~22 days; expected demand during lead time 1.9.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 44, order up to 84.
  • 4.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Single source
On hand / on order
53 / 0
no open PO
Today Min / Max
48 / 81
static parameters in BoM
Rec. Min (reorder point)
44
safety stock 43
Rec. Max
84
order qty 40
Service level
100.0%
stockout risk now 0%
Unit price
Rp 83,751
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 141 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (288 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 302.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 5 functional locations

4 with criticality A/B · 68 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_CL-932
RICH AMINE COLUMN
A851.66
PY_HE-784C
LUBE OIL EXCHANGER
A1620.65
PX_HE-605
WASH WATER EXCHANGER
A1600.22
PX_LCV-1083A
HE-713D LEVEL CONTROL
A1600.12
PX_KC-505D
METHANE COMPRESSOR
S1211.00

Lead time and procurement

Lead time 22 ± 10 days (PO history, 5 PO lines) · on-time 45%

PR dateTypeQtyUnit priceDeliveryLead time
29 Jul 2026PR06
Regular replenishment
102Rp 89,13209 Aug 202611 d
03 Mar 2026PR03
Regular replenishment
88Rp 83,49122 Mar 202619 d
10 Dec 2025PR03
Regular replenishment
121Rp 83,75111 Jan 202632 d
08 Dec 2025PR03
Regular replenishment
127Rp 84,05030 Dec 202522 d
26 Sept 2025PR03
Regular replenishment
96Rp 81,79617 Oct 202521 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
07 Jul 2027PX_KC-505DCompressor major overhaul8.59

Recent notifications on its equipment

DatePriorityFuncLocDescription
31 Aug 2026LowPX_CL-932CL-932 DP high
20 Aug 2026MediumPX_CL-932CL-932 DP high
02 Jul 2026MediumPX_CL-932Inspect CL-932 internal
19 Jun 2026MediumPY_HE-784CRepair insulation HE-784C
02 Jun 2026MediumPX_CL-932Install scaffolding at CL-932
21 Jun 2025HighPX_KC-505DRepair insulation KC-505D
31 May 2025MediumPX_CL-932PSM25/Inspect CL-932 internal
23 May 2025LowPY_HE-784CRetubing HE-784C

Recent goods issues

Posting dateQtyOrderOrder type
13 May 202632201000021171Corrective
31 Jul 2025288203000033054Turnaround
27 Jul 20254201000026768Corrective
27 Jul 20258201000026768Corrective