STUDBOLT,1INX115MM,B7/2H
Material 4100025651 · STUDBOLT · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100025651
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 6 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 199 EA/year: 199 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~23 days; expected demand during lead time 13.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 144, order up to 343.
- 4.On hand 21 + on order 0 is at or below the reorder point: order 322 now.
- 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
322 EA
Rp 12.2M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Price estimatedLead time estimated
On hand / on order
21 / 0
no open PO
Today Min / Max
5 / 12
static parameters in BoM
Rec. Min (reorder point)
144
safety stock 132
Rec. Max
343
order qty 199
Service level
100.0%
stockout risk now 23%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 274 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 888.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 6 functional locations
4 with criticality A/B · 68 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-111 CRACKING FURNACE BF-111 | A | 20 | 23 | 9.01 |
| PX_CL-1833 CHARGE GAS COLUMN | A | 4 | 0 | 0.38 |
| PX_VD-623 C3 RECYCLE DRUM | B | 4 | 3 | 0.93 |
| PY_LCV-1032B PP-583B LEVEL CONTROL | B | 16 | 0 | 0.12 |
| PX_KC-879A CONDENSATE FAN | S | 8 | 6 | 2.71 |
| PY_HE-1144C CHARGE GAS TLE | S | 16 | 2 | 0.65 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 24 Sept 2026 | Low | PX_KC-879A | Inspect coupling KC-879A |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 10 Sept 2026 | Medium | PX_BF-111 | Peep door broken BF-111 |
| 07 Sept 2026 | Medium | PX_KC-879A | Replace lamp as per PM finding |
| 03 Aug 2026 | Medium | PX_BF-111 | Thermograph wall BF-111 |
| 11 Jul 2026 | Medium | PX_BF-111 | Thermograph wall BF-111 |
| 27 Jun 2026 | Medium | PX_BF-111 | Leak from packing |
| 10 Jun 2026 | Medium | PX_KC-879A | [MSI-B-26-PWM-186/M] Replace line |
| 15 May 2026 | Medium | PX_KC-879A | Overhaul |
| 08 May 2026 | Medium | PX_BF-111 | Repair refractory crack BF-111 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 31 Dec 2025 | 48 | 201000017823 | Corrective |