STUDBOLT,1INX115MM,B7/2H

Material 4100025651 · STUDBOLT · Plant 1000

AReorderNormalSlow-moving
Material
4100025651
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Forecast 199 EA/year: 199 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~23 days; expected demand during lead time 13.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 144, order up to 343.
  • 4.On hand 21 + on order 0 is at or below the reorder point: order 322 now.
  • 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
322 EA
Rp 12.2M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Price estimatedLead time estimated
On hand / on order
21 / 0
no open PO
Today Min / Max
5 / 12
static parameters in BoM
Rec. Min (reorder point)
144
safety stock 132
Rec. Max
343
order qty 199
Service level
100.0%
stockout risk now 23%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 274 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 888.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 6 functional locations

4 with criticality A/B · 68 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-111
CRACKING FURNACE BF-111
A20239.01
PX_CL-1833
CHARGE GAS COLUMN
A400.38
PX_VD-623
C3 RECYCLE DRUM
B430.93
PY_LCV-1032B
PP-583B LEVEL CONTROL
B1600.12
PX_KC-879A
CONDENSATE FAN
S862.71
PY_HE-1144C
CHARGE GAS TLE
S1620.65

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026LowPX_KC-879AInspect coupling KC-879A
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
07 Sept 2026MediumPX_KC-879AReplace lamp as per PM finding
03 Aug 2026MediumPX_BF-111Thermograph wall BF-111
11 Jul 2026MediumPX_BF-111Thermograph wall BF-111
27 Jun 2026MediumPX_BF-111Leak from packing
10 Jun 2026MediumPX_KC-879A[MSI-B-26-PWM-186/M] Replace line
15 May 2026MediumPX_KC-879AOverhaul
08 May 2026MediumPX_BF-111Repair refractory crack BF-111

Recent goods issues

Posting dateQtyOrderOrder type
31 Dec 202548201000017823Corrective