Sparely
DU

STUDBOLT,7/8INX70MM,B7/2H

Material 4100025686 · STUDBOLT · Plant 1000

AReorderNormalBelow reorder point
Material
4100025686
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 4 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
24 d · P80 39 d
Unit price
Rp 20,945

Recommendation

  • 1.Forecast 8.0 EA/year: 8.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~24 days; expected demand during lead time 0.5.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 16, order up to 24.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 23 now.
  • 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
23 EA
Rp 481,724 · order by 01 Oct 2026
Expected arrival ≈ 24 days
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
16
safety stock 16
Rec. Max
24
order qty 8
Service level
100.0%
stockout risk now 6%
Unit price
Rp 20,945
PO history
ML early warning: 23% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 38 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 213.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 4 functional locations

3 with criticality A/B · 64 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-513
TURBINE FOR KC-513
A421.53
PX_VD-123A
C3 RECYCLE SEPARATOR
A1610.08
PX_HE-245
BOTTOM COOLER
B2000.22
PX_1-P-12689-B22A
PIPE-1 FROM PP-315A TO VD-664B
C2400.01

Lead time and procurement

Lead time 24 ± 15 days (PO history + category, 2 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
08 Sept 2026PR03
Regular replenishment
1Rp 20,61523 Sept 202615 d
14 Aug 2025PR06
Regular replenishment
3Rp 21,27419 Sept 202536 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting
16 May 2025MediumPX_VD-123APSM25/Repair insulation VD-123A
03 May 2025MediumPX_KT-513KT-513 governor valve hunting

Recent goods issues

Posting dateQtyOrderOrder type
24 Aug 20268201000000994Corrective