STUDBOLT,7/8INX70MM,B7/2H
Material 4100025686 · STUDBOLT · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100025686
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 24 d · P80 39 d
- Unit price
- Rp 20,945
Recommendation
- 1.Forecast 8.0 EA/year: 8.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~24 days; expected demand during lead time 0.5.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 16, order up to 24.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 23 now.
- 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
23 EA
Rp 481,724 · order by 01 Oct 2026
Expected arrival ≈ 24 days
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
16
safety stock 16
Rec. Max
24
order qty 8
Service level
100.0%
stockout risk now 6%
Unit price
Rp 20,945
PO history
ML early warning: 23% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 38 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 213.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 4 functional locations
3 with criticality A/B · 64 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-513 TURBINE FOR KC-513 | A | 4 | 2 | 1.53 |
| PX_VD-123A C3 RECYCLE SEPARATOR | A | 16 | 1 | 0.08 |
| PX_HE-245 BOTTOM COOLER | B | 20 | 0 | 0.22 |
| PX_1-P-12689-B22A PIPE-1 FROM PP-315A TO VD-664B | C | 24 | 0 | 0.01 |
Lead time and procurement
Lead time 24 ± 15 days (PO history + category, 2 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 08 Sept 2026 | PR03 Regular replenishment | 1 | Rp 20,615 | 23 Sept 2026 | 15 d |
| 14 Aug 2025 | PR06 Regular replenishment | 3 | Rp 21,274 | 19 Sept 2025 | 36 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 04 Jan 2026 | Medium | PX_KT-513 | KT-513 governor valve hunting |
| 16 May 2025 | Medium | PX_VD-123A | PSM25/Repair insulation VD-123A |
| 03 May 2025 | Medium | PX_KT-513 | KT-513 governor valve hunting |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 24 Aug 2026 | 8 | 201000000994 | Corrective |