STUDBOLT,1/2INX50MM,B16/4

Material 4100025701 · STUDBOLT · Plant 1000

AReduceSlow-moving
Material
4100025701
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Forecast 35 EA/year: 35 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~23 days; expected demand during lead time 2.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 48, order up to 83.
  • 4.Stock 105 exceeds the level to keep (83) by 22.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
105 / 0
no open PO
Today Min / Max
24 / 67
static parameters in BoM
Rec. Min (reorder point)
48
safety stock 46
Rec. Max
83
order qty 35
Service level
100.0%
stockout risk now 0%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 298 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 310.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 3 functional locations

2 with criticality A/B · 36 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-717
FLUSHING OIL COMPRESSOR
A1294.00
PX_CL-473
QUENCH OIL SCRUBBER
A2000.38
PX_PCV-279C
HE-156 PRESSURE CONTROL
S400.08

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026LowPX_KC-717Leak from packing
08 Aug 2026MediumPX_KC-717Repair insulation KC-717
20 Jul 2026LowPX_KC-717Inspect coupling KC-717
05 Jul 2026MediumPX_KC-717Overhaul
12 Mar 2026LowPX_KC-717Replace lamp as per PM finding
01 Mar 2026MediumPX_KC-717Leak from packing
15 Nov 2025LowPX_KC-717Leak from packing
19 Aug 2025MediumPX_KC-717Repair insulation KC-717
18 May 2025LowPX_KC-717Overhaul

Recent goods issues

Posting dateQtyOrderOrder type
07 Dec 202524204000016765Preventive