STUDBOLT,1/2INX50MM,B16/4
Material 4100025701 · STUDBOLT · Plant 1000
AReduceSlow-moving
- Material
- 4100025701
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 35 EA/year: 35 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~23 days; expected demand during lead time 2.2.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 48, order up to 83.
- 4.Stock 105 exceeds the level to keep (83) by 22.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
105 / 0
no open PO
Today Min / Max
24 / 67
static parameters in BoM
Rec. Min (reorder point)
48
safety stock 46
Rec. Max
83
order qty 35
Service level
100.0%
stockout risk now 0%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 298 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 310.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 3 functional locations
2 with criticality A/B · 36 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-717 FLUSHING OIL COMPRESSOR | A | 12 | 9 | 4.00 |
| PX_CL-473 QUENCH OIL SCRUBBER | A | 20 | 0 | 0.38 |
| PX_PCV-279C HE-156 PRESSURE CONTROL | S | 4 | 0 | 0.08 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Sept 2026 | Low | PX_KC-717 | Leak from packing |
| 08 Aug 2026 | Medium | PX_KC-717 | Repair insulation KC-717 |
| 20 Jul 2026 | Low | PX_KC-717 | Inspect coupling KC-717 |
| 05 Jul 2026 | Medium | PX_KC-717 | Overhaul |
| 12 Mar 2026 | Low | PX_KC-717 | Replace lamp as per PM finding |
| 01 Mar 2026 | Medium | PX_KC-717 | Leak from packing |
| 15 Nov 2025 | Low | PX_KC-717 | Leak from packing |
| 19 Aug 2025 | Medium | PX_KC-717 | Repair insulation KC-717 |
| 18 May 2025 | Low | PX_KC-717 | Overhaul |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 07 Dec 2025 | 24 | 204000016765 | Preventive |