STUDBOLT,7/8INX85MM,B16/4
Material 4100025739 · STUDBOLT · Plant 1000
ASafety-criticalReorderNormalBelow reorder point
- Material
- 4100025739
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 5 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 106 EA/year: 106 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~23 days; expected demand during lead time 6.7.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 91, order up to 198.
- 5.On hand 12 + on order 0 is at or below the reorder point: order 186 now.
- 6.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
186 EA
Rp 7.0M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
12 / 0
no open PO
Today Min / Max
8 / 22
static parameters in BoM
Rec. Min (reorder point)
91
safety stock 85
Rec. Max
198
order qty 107
Service level
100.0%
stockout risk now 14%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 28% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 54 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 504.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 5 functional locations
2 with criticality A/B · 100 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-880 TEMPERATURE CONTROL VALVE | A | 24 | 1 | 0.12 |
| PX_PP-169A QUENCH OIL PUMP | B | 20 | 5 | 1.90 |
| PX_HE-1572C ETHYLENE TLE | C | 24 | 0 | 0.22 |
| PX_HE-955C LUBE OIL REBOILER | S | 20 | 3 | 1.08 |
| PX_PRV-902 SAFETY VALVE HE-1221D | S | 12 | 0 | 0.04 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 27 Jul 2026 | Medium | PX_HE-955C | Retubing HE-955C |
| 22 Jul 2026 | Medium | PX_PP-169A | Install cover plate for MCP cracking |
| 25 Jun 2026 | Medium | PX_PP-169A | PP-169A seal leak |
| 05 Apr 2026 | Medium | PX_PP-169A | Overhaul PP-169A |
| 20 Dec 2025 | Medium | PX_PP-169A | Overhaul PP-169A |
| 15 Aug 2025 | Low | PX_HE-955C | Replace lamp as per PM finding |
| 27 May 2025 | Medium | PX_TCV-880 | Install scaffolding at TCV-880 |
| 22 May 2025 | Medium | PX_HE-955C | Install scaffolding at HE-955C |
| 11 May 2025 | Low | PX_PP-169A | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Aug 2026 | 16 | 201000012209 | Corrective |
| 07 Aug 2026 | 96 | 201000012209 | Corrective |
| 28 Jul 2025 | 24 | 201000032360 | Corrective |