Sparely
DU

STUDBOLT,7/8INX85MM,B16/4

Material 4100025739 · STUDBOLT · Plant 1000

ASafety-criticalReorderNormalBelow reorder point
Material
4100025739
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 5 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 106 EA/year: 106 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~23 days; expected demand during lead time 6.7.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 91, order up to 198.
  • 5.On hand 12 + on order 0 is at or below the reorder point: order 186 now.
  • 6.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
186 EA
Rp 7.0M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
12 / 0
no open PO
Today Min / Max
8 / 22
static parameters in BoM
Rec. Min (reorder point)
91
safety stock 85
Rec. Max
198
order qty 107
Service level
100.0%
stockout risk now 14%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 28% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 54 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 504.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 5 functional locations

2 with criticality A/B · 100 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-880
TEMPERATURE CONTROL VALVE
A2410.12
PX_PP-169A
QUENCH OIL PUMP
B2051.90
PX_HE-1572C
ETHYLENE TLE
C2400.22
PX_HE-955C
LUBE OIL REBOILER
S2031.08
PX_PRV-902
SAFETY VALVE HE-1221D
S1200.04

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Jul 2026MediumPX_HE-955CRetubing HE-955C
22 Jul 2026MediumPX_PP-169AInstall cover plate for MCP cracking
25 Jun 2026MediumPX_PP-169APP-169A seal leak
05 Apr 2026MediumPX_PP-169AOverhaul PP-169A
20 Dec 2025MediumPX_PP-169AOverhaul PP-169A
15 Aug 2025LowPX_HE-955CReplace lamp as per PM finding
27 May 2025MediumPX_TCV-880Install scaffolding at TCV-880
22 May 2025MediumPX_HE-955CInstall scaffolding at HE-955C
11 May 2025LowPX_PP-169AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
08 Aug 202616201000012209Corrective
07 Aug 202696201000012209Corrective
28 Jul 202524201000032360Corrective