Sparely
DU

STUDBOLT,1/2INX90MM,B16/4

Material 4100025846 · STUDBOLT · Plant 1000

CReorderNormalSlow-moving
Material
4100025846
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 5 FuncLocs A/B)
Supplier
BINTANG MESINDO PRATAMA PT
Lead time
23 d · P80 39 d
Unit price
Rp 53,694

Recommendation

  • 1.Forecast 26 EA/year: 23 unplanned (credibility blend: own history + installed-base prior) + 2.9 from the maintenance plan.
  • 2.Lead time ~23 days; expected demand during lead time 1.4.
  • 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 35.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 33 now.
Proposed purchase requisition
33 EA
Rp 1.8M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 7
Rec. Max
35
order qty 27
Service level
99.4%
stockout risk now 30%
Unit price
Rp 53,694
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 378 days ago, 11 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 31.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~10 days.

Installed on 5 functional locations

0 with criticality A/B · 68 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_3/4-FG-10740-A41A-C
PIPE-3/4 FROM HE-1903 TO HE-118B
C1600.01
PX_BF-110
CRACKING FURNACE BF-110
S244114.58
PX_KC-891A
HYDROGEN FAN
S851.85
PX_KT-264A
TURBINE FOR KC-264A
S442.39
PX_KC-856A
DEMIN WATER COMPRESSOR
S1621.00

Lead time and procurement

Lead time 23 ± 15 days (PO history + category, 1 PO lines) · on-time 49%

PR dateTypeQtyUnit priceDeliveryLead time
13 Aug 2025PR06
Regular replenishment
6Rp 53,69403 Sept 202521 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul2.86

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
16 Sept 2026MediumPX_KC-891AKC-891A high vibration
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
11 Sept 2026MediumPX_BF-110Leak from packing
03 Sept 2026LowPX_BF-110Hot spot at convection BF-110
03 Sept 2026MediumPX_BF-110Thermograph wall BF-110
01 Sept 2026MediumPX_BF-110Replace burner tip BF-110
30 Aug 2026LowPX_BF-110Leak from packing
07 Aug 2026MediumPX_BF-110Install scaffolding at BF-110

Recent goods issues

Posting dateQtyOrderOrder type
18 Sept 20254201000022192Corrective
12 Sept 202512204000001794Preventive