Sparely
DU

STUDBOLT,7/8INX55MM,B8M/8M

Material 4100025917 · STUDBOLT · Plant 1000

AMonitorCritical insurance spare
Material
4100025917
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Forecast 16 EA/year: 16 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~23 days; expected demand during lead time 1.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 27, order up to 54.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
10 / 0
no open PO
Today Min / Max
5 / 16
static parameters in BoM
Rec. Min (reorder point)
27
safety stock 26
Rec. Max
54
order qty 27
Service level
99.9%
stockout risk now 4%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 130.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 2 functional locations

1 with criticality A/B · 28 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-492C
CONDENSATE TLE
A2010.22
PX_BF-110
CRACKING FURNACE BF-110
S84114.58

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
11 Sept 2026MediumPX_BF-110Leak from packing
03 Sept 2026LowPX_BF-110Hot spot at convection BF-110
03 Sept 2026MediumPX_BF-110Thermograph wall BF-110
01 Sept 2026MediumPX_BF-110Replace burner tip BF-110
30 Aug 2026LowPX_BF-110Leak from packing
07 Aug 2026MediumPX_BF-110Install scaffolding at BF-110
07 Aug 2026MediumPX_BF-110Painting BF-110

Recent goods issues

Never issued in the 17-month history.