Sparely
DU

STUDBOLT,1/2INX50MM,B8M/8M

Material 4100026095 · STUDBOLT · Plant 1000

AReorderNormalSlow-moving
Material
4100026095
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
28 d · P80 37 d
Unit price
Rp 82,321

Recommendation

  • 1.Forecast 54 EA/year: 54 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~28 days; expected demand during lead time 4.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 54, order up to 108.
  • 4.On hand 15 + on order 0 is at or below the reorder point: order 93 now.
  • 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
93 EA
Rp 7.7M · order by 01 Oct 2026
Expected arrival ≈ 28 days
Single source
On hand / on order
15 / 0
no open PO
Today Min / Max
3 / 8
static parameters in BoM
Rec. Min (reorder point)
54
safety stock 50
Rec. Max
108
order qty 54
Service level
100.0%
stockout risk now 20%
Unit price
Rp 82,321
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 408 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 639.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 3 functional locations

3 with criticality A/B · 56 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-109
CRACKING FURNACE BF-109
A162911.58
PX_VD-1465A
GASOLINE ACCUMULATOR
A2020.51
PX_HE-1026
METHANE TLE
A2000.22

Lead time and procurement

Lead time 28 ± 11 days (PO history, 3 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
24 Apr 2026PR06
Regular replenishment
17Rp 83,66220 May 202626 d
25 Jul 2025PR03
Regular replenishment
9Rp 81,92225 Aug 202531 d
26 Jun 2025PR04
Regular (other)
10Rp 82,32106 Aug 202541 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
03 Sept 2026LowPX_BF-109Install scaffolding at BF-109
02 Sept 2026LowPX_BF-109Install cover plate for MCP cracking
16 Aug 2026MediumPX_BF-109Install cover plate BF-109
13 Jul 2026MediumPX_BF-109Cleaning burner BF-109
09 Jul 2026MediumPX_BF-109Thermograph wall BF-109
09 Jul 2026LowPX_BF-109Leak from packing
01 Jul 2026EmergencyPX_BF-109[MSI-B-26-YDN-280/M] Replace line
23 Jun 2026HighPX_BF-109Cleaning burner BF-109

Recent goods issues

Posting dateQtyOrderOrder type
19 Aug 20254201000035782Corrective
18 Aug 202532201000035782Corrective