STUDBOLT,5/8INX55MM,B8M/8M

Material 4100026182 · STUDBOLT · Plant 1000

ASafety-criticalReorderNormalSlow-moving
Material
4100026182
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 6 FuncLocs A/B, 3 safety/shutdown valve)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Safety-critical element: installed on 3 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 32 EA/year: 32 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~23 days; expected demand during lead time 2.0.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 62, order up to 95.
  • 5.On hand 8 + on order 0 is at or below the reorder point: order 87 now.
  • 6.Installed on 6 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
87 EA
Rp 3.3M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
8 / 0
no open PO
Today Min / Max
7 / 14
static parameters in BoM
Rec. Min (reorder point)
62
safety stock 60
Rec. Max
95
order qty 33
Service level
100.0%
stockout risk now 6%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 279 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 224.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 6 functional locations

2 with criticality A/B · 96 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-1258D
SAFETY VALVE VD-444B
A1600.04
PY_PRV-980
SAFETY VALVE HE-846B
A400.04
PX_TCV-1913
PP-1160 TEMP CONTROL
C2000.12
PX_VD-1730
QUENCH WATER KO DRUM
C1200.08
PX_KT-778A
TURBINE FOR KC-778A
S2401.10
PX_PRV-1310B
SAFETY VALVE PP-1070B
S2000.04

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
26 Dec 202532201000023104Corrective
24 Sept 202548201000015979Corrective
23 Sept 202512201000015979Corrective