STUDBOLT,7/8INX30MM,B8M/8M

Material 4100026343 · STUDBOLT · Plant 1000

AReorderNormalSlow-moving
Material
4100026343
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
GEMILANG LOGAM MAKMUR PT
Lead time
31 d · P80 39 d
Unit price
Rp 13,781

Recommendation

  • 1.Forecast 57 EA/year: 57 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~31 days; expected demand during lead time 4.9.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 36, order up to 94.
  • 4.On hand 14 + on order 0 is at or below the reorder point: order 80 now.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
80 EA
Rp 1.1M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Single source
On hand / on order
14 / 0
no open PO
Today Min / Max
4 / 8
static parameters in BoM
Rec. Min (reorder point)
36
safety stock 32
Rec. Max
94
order qty 58
Service level
99.9%
stockout risk now 6%
Unit price
Rp 13,781
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 227 days ago, 12 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 2 functional locations

1 with criticality A/B · 32 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-103
CRACKING FURNACE BF-103
A123814.58
PX_CL-121
BFW COLUMN
S2041.23

Lead time and procurement

Lead time 31 ± 15 days (PO history + category, 2 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
23 Nov 2025PR03
Regular replenishment
4Rp 13,65601 Jan 202639 d
02 Oct 2025PR05
Project / turnaround
2Rp 13,90519 Nov 202548 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-103Leak from packing
19 Sept 2026LowPX_BF-103Leak from packing
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding
11 Sept 2026MediumPX_BF-103Decoking follow up BF-103
26 Aug 2026MediumPX_BF-103Replace lamp as per PM finding
26 Aug 2026MediumPX_BF-103Hot spot at convection BF-103
03 Aug 2026MediumPX_BF-103Install scaffolding at BF-103
24 Jul 2026MediumPX_BF-103Thermograph wall BF-103
23 Jul 2026EmergencyPX_BF-103Decoking follow up BF-103

Recent goods issues

Posting dateQtyOrderOrder type
16 Feb 202612201000031289Corrective