STUDBOLT,7/8INX95MM,B7/2H

Material 4100026344 · STUDBOLT · Plant 1000

BMonitorCritical insurance spare
Material
4100026344
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
25 d · P80 39 d
Unit price
Rp 26,942

Recommendation

  • 1.Forecast 1.2 EA/year: 1.2 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~25 days; expected demand during lead time 0.1.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 27.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Single source
On hand / on order
10 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
27
order qty 27
Service level
99.7%
stockout risk now 0%
Unit price
Rp 26,942
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~10 days.

Installed on 1 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1372D
INHIBITOR COOLER
B431.08

Lead time and procurement

Lead time 25 ± 15 days (PO history + category, 1 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
23 Dec 2025PR03
Regular replenishment
2Rp 26,94223 Jan 202631 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Aug 2026MediumPX_HE-1372DHE-1372D fouling
09 May 2026MediumPX_HE-1372DRetubing HE-1372D
11 May 2025LowPX_HE-1372DPainting HE-1372D

Recent goods issues

Never issued in the 17-month history.