STUDBOLT,3/4INX100MM,B8M/8M
Material 4100026355 · STUDBOLT · Plant 1000
AReduceNon-moving
- Material
- 4100026355
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 3.2 EA/year: 3.2 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~23 days; expected demand during lead time 0.2.
- 3.A 99.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 27.
- 4.Stock 32 exceeds the level to keep (27) by 5.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
32 / 0
no open PO
Today Min / Max
4 / 13
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
27
order qty 27
Service level
99.2%
stockout risk now 0%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 25.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 3 functional locations
2 with criticality A/B · 52 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-1475 C3 RECYCLE STRIPPER | A | 16 | 2 | 0.81 |
| PX_PP-1434 SPENT CAUSTIC PUMP | B | 20 | 4 | 1.90 |
| PX_HE-844A SEAL OIL TLE | C | 16 | 0 | 0.22 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 Sept 2026 | Low | PX_PP-1434 | PP-1434 discharge pressure low |
| 30 Aug 2026 | Emergency | PX_CL-1475 | Replace lamp as per PM finding |
| 23 Aug 2026 | Medium | PX_PP-1434 | PP-1434 abnormal noise |
| 14 Aug 2026 | Medium | PX_PP-1434 | Replace lamp as per PM finding |
| 09 Jul 2025 | High | PX_PP-1434 | PP-1434 seal leak |
| 04 May 2025 | Low | PX_CL-1475 | Install scaffolding at CL-1475 |
Recent goods issues
Never issued in the 17-month history.