Material 4100026397 · STUDBOLT · Plant 1000

AMonitorCritical insurance spare
Material
4100026397
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Forecast 31 EA/year: 31 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~23 days; expected demand during lead time 2.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 54, order up to 86.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
5 / 13
static parameters in BoM
Rec. Min (reorder point)
54
safety stock 53
Rec. Max
86
order qty 32
Service level
100.0%
stockout risk now 7%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 15 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 253.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 2 functional locations

1 with criticality A/B · 32 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-102
CRACKING FURNACE BF-102
A127128.72
PY_LCV-1900
LEVEL CONTROL VALVE
C2000.12

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
07 Sept 2026LowPX_BF-102Thermograph wall BF-102
06 Sept 2026MediumPX_BF-102Decoking follow up BF-102
03 Sept 2026MediumPX_BF-102Replace lamp as per PM finding
30 Aug 2026HighPX_BF-102Painting BF-102
27 Aug 2026MediumPX_BF-102Decoking follow up BF-102
14 Aug 2026EmergencyPX_BF-102Thermograph wall BF-102
12 Aug 2026HighPX_BF-102Peep door broken BF-102
12 Aug 2026HighPX_BF-102Replace lamp as per PM finding
01 Aug 2026HighPX_BF-102Replace lamp as per PM finding

Recent goods issues

Never issued in the 17-month history.