STUDBOLT,5/8INX65MM,B8M/8M
Material 4100026430 · STUDBOLT · Plant 1000
AReorderNormalTAM reserve
- Material
- 4100026430
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 48 EA/year: 48 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~23 days; expected demand during lead time 3.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 54, order up to 102.
- 4.On hand 17 + on order 0 is at or below the reorder point: order 85 now.
- 5.Used only during the last turnaround (72 EA): keep it for the next one instead of treating it as slow-moving.
- 6.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
85 EA
Rp 3.2M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Last turnaround used 72Price estimatedLead time estimated
On hand / on order
17 / 0
no open PO
Today Min / Max
7 / 16
static parameters in BoM
Rec. Min (reorder point)
54
safety stock 51
Rec. Max
102
order qty 48
Service level
100.0%
stockout risk now 11%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 21 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (72 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 384.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 4 functional locations
4 with criticality A/B · 60 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 4 | 114 | 42.86 |
| PX_KC-155D CAUSTIC BLOWER | A | 24 | 0 | 0.57 |
| PX_PP-1101A REFLUX PUMP | A | 8 | 0 | 0.19 |
| PX_TCV-577 TEMPERATURE CONTROL VALVE | A | 24 | 0 | 0.12 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 20 Sept 2026 | Medium | PX_BF-105 | Replace lamp as per PM finding |
| 20 Sept 2026 | Medium | PX_BF-105 | Install scaffolding at BF-105 |
| 14 Sept 2026 | Low | PX_BF-105 | Install cover plate BF-105 |
| 13 Sept 2026 | Medium | PX_BF-105 | Thermograph wall BF-105 |
| 06 Sept 2026 | Medium | PX_BF-105 | Repair insulation BF-105 |
| 01 Sept 2026 | Low | PX_BF-105 | Peep door broken BF-105 |
| 30 Aug 2026 | Medium | PX_BF-105 | Painting BF-105 |
| 29 Aug 2026 | Medium | PX_BF-105 | Leak from packing |
| 27 Aug 2026 | Medium | PX_BF-105 | Thermograph wall BF-105 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Jan 2026 | 72 | 203000029956 | Turnaround |