STUDBOLT,1INX65MM,B7/2H

Material 4100026463 · STUDBOLT · Plant 1000

BMonitorInsurance gap
Material
4100026463
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~23 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 27.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
27
order qty 27
Service level
100.0%
stockout risk now 0%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 417,072/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~10 days.

Installed on 2 functional locations

1 with criticality A/B · 28 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-146
BOTTOM FLOW CONTROL
B2000.11
PX_PCV-1065
PRESSURE CONTROL VALVE
C800.08

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.